Creed Construction

Creed Construction Residential | Commercial | Fit Out | Heritage | Remedial
Build > Renovate > Refurb > Extend > Restore

| TRANQUIL |The beauty of natural and passive lighting effortlessy created an open and vibrant kitchen space accompanied...
01/03/2025

| TRANQUIL |

The beauty of natural and passive lighting effortlessy created an open and vibrant kitchen space accompanied by timeless, classic finishes.

Concise planning and procurement with our client allowed for the successful delivery in a tight but timely manner without prolonged disruption to the household. We ensured this project was ready for all the Christmas celebrations and festivities.

| MINARAH COLLEGE - Senior Bathroom Block |Complete refurbishment of the existing senior male and female bathroom block,...
22/02/2025

| MINARAH COLLEGE - Senior Bathroom Block |

Complete refurbishment of the existing senior male and female bathroom block, while targeting key procurement and handover dates to ensure the students had a fresh bathroom to use on the first day back at school.

Custom made stainless steel troughs with pre-plumbed push button timer mixers, pedestal mounted compact laminate toilet partitions in Elegant Oak, anti-vandal toilet suites, epoxy grouted tiles and enhanced essential lighting are key features of this project.

| ARISE |Creating an inviting, light and vibrant touch to accentuate your dream homes entertainment space. We were engag...
17/12/2024

| ARISE |

Creating an inviting, light and vibrant touch to accentuate your dream homes entertainment space.

We were engaged to create a warmer and open alfresco with soft colour hues and textures to revamp a dull and limited area.

Sound delivery of our clients key architectural features made this project all the more satisfying when coupled with battling tight access requirements, highly trafficable inner city location and a live day-to-day household.

Stage 2 of our BCA and Fire Compliance Building upgrade works at the Sydney Water Waste Treatment Plant in Quakers Hill....
06/12/2024

Stage 2 of our BCA and Fire Compliance Building upgrade works at the Sydney Water Waste Treatment Plant in Quakers Hill.

Stages 2 and 3 centred around the two High Voltage Electrical Buildings that power the plants essential day to day operation.

In order to undertake our works, each building had to be powered down individually with all existing transformers decommissioned and removed all while subject to critical programming and timing.

Works included:
- Removal and disposal of Asbestos ceiling linings inclusive of air monitoring while an exclusion zone was established around both buildings.
- Removal of existing non fire rated door assemblies and roller doors including saw cutting wider openings and propping.
- Additional timber roof framing support in conjunction with galvanised steel posts and beam.
- Toothing of existing bricks to install new steel door lintels to allow enlarging of doorways to meet current BCA code.
- Installation of 3 x layers of Fyrcheck wall and ceiling linings to achieve the minimum fire rating for this class of building.
- Installation of new fire door assemblies inclusive of steel door jambs, fire rated door leafs, fire rated hardware sets and seals.
- Coordination and managing the replacement of the existing High Voltage electrical transformers.

| SPRY |A swift, cosmetic uplift to a dated two bedroom unit for a valued customer of ours after a quick and cost effect...
29/11/2024

| SPRY |

A swift, cosmetic uplift to a dated two bedroom unit for a valued customer of ours after a quick and cost effective flip.

Works captured to bring a fresh light to this home included:
- Complete kitchen renovation package with new splashback, benchtop and appliances.
- Light toned hybrid timber flooring throughout.
- Repainting of previously painted surfaces.
- Upgrade of existing light fittings with new LED Oyster lights.

| KUDO |Complete overhaul of a main bathroom in unit complex. Works included:- Complete strip out of existing.- Level an...
23/11/2024

| KUDO |

Complete overhaul of a main bathroom in unit complex. Works included:
- Complete strip out of existing.
- Level and render walls.
- New suspended plasterboard ceiling.
- New waterproof membrane to walls and floors.
- Full height wall tiles.
- New bathroom fixtures.
- Additional essential and feature lighting inclusive of ventilation.

Stage 1 of our BCA and Fire Compliance upgrade works to the egress doors of the Filtration Building at the Sydney Water ...
14/11/2024

Stage 1 of our BCA and Fire Compliance upgrade works to the egress doors of the Filtration Building at the Sydney Water Waste Treatment Plant in Quakers Hill.

Works included:
- Removal of existing non fire rated door assemblies and roller doors
- Toothing of existing bricks to install new steel door lintels to allow enlarging of doorways to meet current BCA code.
- Vermiculite spraying of steel lintels to meet the Fire Rating of the building.
- Installation of new fire door assemblies inclusive of steel door jambs, fire rated door leafs, fire rated hardware sets and seals.

| GROOVY |The Spotted Gum dance floor is all yours...This perky unit renovation had it all when it came to finishing out...
02/08/2023

| GROOVY |

The Spotted Gum dance floor is all yours...

This perky unit renovation had it all when it came to finishing outside the square.

Hearty hybrid timber flooring, intergalactic door furniture, newly created pop up breakfast bar and all things green for the Main Bedroom.

| RETRO GROOMING |The first of its kind in Sydney - a self serve, dog washing and grooming shop for our little four legg...
01/07/2023

| RETRO GROOMING |

The first of its kind in Sydney - a self serve, dog washing and grooming shop for our little four legged friends.

The fit out incorporates stained and sealed recycled cedar panelling, chequered vinyl flooring and your token Juke Box!

30/12/2022
30/12/2022

Address

Sydney, NSW
2200

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Saturday 8am - 12pm

Telephone

+61411712012

Alerts

Be the first to know and let us send you an email when Creed Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Creed Construction:

Share