Green Civil Services Pty Ltd

Green Civil Services Pty Ltd Green Civil Services is a family-owned Consulting and Civil Construction business that was formed in August 2019.

Green Civil Services is a premier consultancy, design, and construction company serving New South Wales, Victoria, and Queensland.

04/02/2026

Check out our Interview with some of the Locals and Recent visitors of the Boardwalk at Hungry Point Reserve and their thoughts on this amazing project!!!

🚧 We are very pleased to announce the completion of our Hungry Point Cliff Top Walk - Stage 1 project. We are so excited...
21/12/2025

🚧 We are very pleased to announce the completion of our Hungry Point Cliff Top Walk - Stage 1 project. We are so excited for everyone to finally enjoy this amazing Boardwalk.

The project includes the construction of a raised, steel suspended boardwalk with both concrete and Sandstone stair access, along with seating areas, viewing platforms, and landscaping enhancements throughout the project.

Thank you to Sutherland Shire Council for allowing us to make this beautiful project come to life.

09/12/2025

Can't Wait for everyone to see the completion of our Boardwalk at Hungry Point Reserve. Here's a little sneak peek before the opening in a couple of weeks.

21/11/2025

🚧 Hungry Point Cliff Top Walk - Stage 1 Progress Update! We are so close to being complete!! Check out this Progress Video.

The project includes the construction of a raised, steel suspended boardwalk with both concrete and steel stair access from Nicholson Parade, along with seating areas, viewing platforms, and landscaping enhancements.

Stay tuned for the project completion in the coming weeks.

🚧 Hungry Point Cliff Top Walk - Stage 1 Progress Update!We're making great strides since the last update. Here's a quick...
04/11/2025

🚧 Hungry Point Cliff Top Walk - Stage 1 Progress Update!

We're making great strides since the last update. Here's a quick look at where we're at:

- Construction on WW6 and WW7 are underway and nearly completed
- Rock bolting for embankment stabilisation for the cliff face on WW6 and WW7 has commenced
- WW5 entire structure and handrail complete
- All landscaping and planting complete
- Grass Areas have been re-turfed

Stay tuned for the project completion in the coming weeks.

28/10/2025
🚧 We’re thrilled to announce the Completion of the Design & Construct project of the Kyogle Rd Landslip Remediation, Lil...
28/10/2025

🚧 We’re thrilled to announce the Completion of the Design & Construct project of the Kyogle Rd Landslip Remediation, Lillian Rock.

Project is complete with the following full scope
- Construction of an access track
- Preparing the slope by removing eroded material
- Installing a 4m High Gabion Wall Structure
- Subsoil drainage
- Scour protection
- Pavement removal and reinstating the road verge and flexible pavement.

🚧 Hungry Point Cliff Top Walk - Stage 1 Progress Update!We're making great strides since the last update. Here's a quick...
08/09/2025

🚧 Hungry Point Cliff Top Walk - Stage 1 Progress Update!

We're making great strides since the last update. Here's a quick look at where we're at:

- Design on WW6 & WW7 is being redesigned by the clients Designers and our Geotechnical Consultants Alliance.
- Viewing Platform Structures for W8 and W9 have been installed & Handrails have been installed.
- Walkway 3 steel, decking and additional Handrails are complete
- Walkway 4 steel, decking and Handrails are complete.
- Walkways 3 and 4 Stair’s landscape complete. Planting on the way.
- Walkway 5 footings, structural steel and decking are complete. Timber Kick rails are on the way and landscape rehabilitation near completed.

Stay tuned for more updates of the next coming weeks.

We are very pleased to announce the completion of our Design & Construct project of a Public Boardwalk & Shared Path Bet...
01/09/2025

We are very pleased to announce the completion of our Design & Construct project of a Public Boardwalk & Shared Path Between Brooklyn & Kangaroo Point.

The project included 569m of elevated boardwalk, a 14m pedestrian bridge, and a 427m of shared concrete path.

Thank you to Hornsby Shire Council for allowing us to make this beautiful project come to life, as well as Wagners CFT for Designing & Supplying the FRP materials for the Boardwalk & Bridge. Thank you to Westlake Punnett for their involvement in Designing all of the Civil Components of this project and to Teleo Design Pty Ltd for certifying all of the structural components.

13/06/2025

Check out our latest Progress Video of the Elevated Boardwalk, Pedestrian bridge & Shared Path for our ongoing Design & Construct project of a Public Boardwalk & Shared Path at Kangaroo Point.

The project includes 520m of elevated boardwalk, a 14m pedestrian bridge, and a 465m of shared concrete path.

We are super close to being finished with only a few weeks left. Keep a look out for more updates to come!

🚧 We’re thrilled to announce the Completion of our Construction project of the Canoe Launch Ramp at Bruce Chick Park, Tw...
04/06/2025

🚧 We’re thrilled to announce the Completion of our Construction project of the Canoe Launch Ramp at Bruce Chick Park, Tweed. Another great project working with Teleo Design and Wagners CFT.

The Bruce Chick scope and material included a 18m FRP Canoe Launch Ramp and a small concrete shared path link up.
· 50% of the Ramp is situated in the water challenging the installation of the of the hand driven 125mm square FRP Piles.
· 125mm FRP Joists supported 125mm double bearer bolted between the driven piles.
· Installed grating is FRP 38mm minimesh with a single FRP Handrail down 1 side.

The purpose of the ramp is to allow access to the community to the estuary system with their kayaks and canoes for recreational enjoyment.

Address

125/7 Hoyle Avenue
Sydney, NSW
2154

Alerts

Be the first to know and let us send you an email when Green Civil Services Pty Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share