TBF BUILT

TBF BUILT Design and construct luxury new homes and renovations. Located in Sydney

11/05/2026

Months of planning, problem-solving and hard work have led us to the final stages of our Art Deco apartment makeover, here in Sydney’s Eastern Suburbs.

All of our bench-tops and joinery have now been completed. Painters and plumbers are wrapping up their final touches, and our beautiful hardwood flooring has been sanded.

Follow us to see the final reveal!

03/05/2026

Should we get the boys in front of the camera next time? 🤔

30/04/2026

Back at our heritage build in Rozelle for one of our final site updates before handover!

Our Blackbutt hardwood floors are down across both levels and are already starting to look the part. ✅

The upstairs balcony has had a full transformation, completely rebuilt and finished in eco-decking. ✅

Downstairs, our porcelain benchtops have been installed in the kitchen. The skylights are in, and finishes are being fitted in both downstairs bedrooms. ✅

Out the front, we’ve got custom fascia boards made by the team at .oak.carpentery, perfectly matched to the original boards and complementing our brand new galvanised roof. ✅

Now it’s all about the final touches as the team fine-tunes the last details over the coming days.

Got a heritage project in need of a full restoration? Reach out to us today. 📲

29/04/2026

We’re now 7 weeks into our Eastlakes Project. Come and take a look at what we’ve been up to, and what’s to come!

24/04/2026

This is why the builder should come first in pre-construction. 👇🏼

Bringing the builder in early means everything is shaped around your budget first, then your design - not the other way around.

We work alongside your architect and engineer from day one to make sure the design is actually buildable and aligned with your brief before any work commences.

In our opinion, this makes for the best outcome for all involved.

Reach out to us today to discuss your next project. 📲

22/04/2026

Our frame is up at Project Eastlakes, and you can now see the shape of the home coming together.

The team is installing our Solitex Extasana wrap (by Pro Clima) from top to bottom, creating a fully weathertight barrier around the house. This extra detail is now a non-negotiable on our builds.

Upstairs is taking form, with bedrooms and bathrooms mapped out. Roofing also kicks off this week, with fascia, gutter, sheeting, and skylights being installed.

Follow us to see this build come to life!

14/04/2026

A glimpse into our South Hurstville Project, completed late last year. 🏡

Architect:
Engineer:

08/04/2026

Things are moving swiftly at our Double Bay Site.

Since our last update, we have completed:

Plumbing roughing ✅

Electrical roughing ✅

Demo works ✅

Steel beam installation and fireproofing ✅

Rendering has now wrapped up, and waterproofing is underway.

If you’re looking for a builder who can handle a tight-access project like this, reach out to us today. 📲

31/03/2026

The roof on our Rozelle project has seen better days...

26/03/2026

We're making exciting progress at our Rozelle Site!

✅ Our hardwood flooring has been prepped and glued throughout
✅ Our standout triple-glazed bifold doors and windows are in
✅ Skylights have been cut out in various rooms, soon to be installed
✅ We're restoring the original timber windows and installing custom-matched skirting to honour the home's era.

Looking for a team to transform your heritage build? Reach out to us today.

23/03/2026

Take a look around our Eastlakes jobsite with Tom. 👷🏻‍♂️

Address

Sydney, NSW

Alerts

Be the first to know and let us send you an email when TBF BUILT posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share