Goldfish & Bay

Call Directions Website Contact the business

Goldfish & Bay Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Goldfish & Bay, Engineering service, 1/432 Parramatta Road, Petersham, Sydney.

Goldfish & Bay | Building Design Services
Consulting agency

MULTI-DISCIPLINARY ENGINEERING
Petersham | Middle East

Hydraulic, Fire, Mechanical, Electrical + ASP3, Vertical Transportation & Civil

TOGA's The Kensington on Anzac Parade is complete.142 apartments, SOHO terraces with their own street entries, retail al...
16/11/2026

TOGA's The Kensington on Anzac Parade is complete.

142 apartments, SOHO terraces with their own street entries, retail along Anzac Parade and a communal rooftop garden, right across from the Kensington light rail stop.

Goldfish & Bay designed and documented the hydraulic, mechanical and wet fire services for DASCO Australia, and carried out the final inspections for the occupation certificate in March.

Congratulations to TOGA, DASCO Australia, Turner Studio and Richards Stanisich.

Images and renders courtesy of TOGA

ENGINEERING INSIGHTS | Where Did Sydney's Sewage Go Before Treatment Plants?Off the cliff at Bondi.By the 1870s, Sydney ...
16/11/2026

ENGINEERING INSIGHTS | Where Did Sydney's Sewage Go Before Treatment Plants?

Off the cliff at Bondi.

By the 1870s, Sydney Harbour was grossly polluted. Since 1859 the city's sewage had drained through five outfall sewers straight into it.

The answer was to stop the sewage reaching the harbour at all. Between 1880 and 1889 the Public Works Department built the Bondi Ocean Outfall Sewer, an intercepting sewer that collected flows from the older city sewers and carried them east. It runs about 6.1 kilometres from the corner of Oxford and College Streets in Darlinghurst to Ben Buckler at North Bondi, where it discharged at the cliff face into the ocean.

It is lined in brick with an egg shaped cross section, 2.4 metres by 2.2 metres at the outfall end. The narrow base keeps low flows deep and fast enough to carry solids along instead of leaving them behind. The survey work was so accurate that bricklayers started lining the tunnel before the two ends had even met.

It all ran on gravity, so it could only serve land above it. Lower suburbs later needed pumping stations to lift their sewage up into the system. The sewage went into the ocean untreated until the Bondi treatment plant began partial operation in 1953. A 2.2 kilometre deepwater ocean outfall followed in 1991.

Today the sewer is on the NSW State Heritage Register as the first ocean outfall sewer of its type designed and built in Australia, and it still carries flows to the Bondi plant.

For hydraulic and civil engineers the questions haven't changed: where does it fall, what can gravity reach, and what happens when the catchment grows? The Bondi plant was designed for 250,000 people. It now serves the equivalent of more than 780,000.

Cover photo: Bondi Sewer Vent, J Bar, Wikimedia Commons, CC BY-SA 3.0

13/11/2026

THIRD.I CHARITY GOLF DAY | A day for the Gamblen family

Last month, Nicolas Sleiman, Paul Debattista and Samuel Youssef joined Thirdi Group at Northbridge Golf Club for their Charity Golf Day, held in support of the Gamblen family.

Thank you to Thirdi Group for having us. It was a day about more than golf, and it was great to see so many people turn out for the family. We've worked alongside the Third.i team on projects including The Rushcutters and Muse Potts Point, and it was good to spend a day together off site.

We'll keep the scores to ourselves.

If you'd like to support the family, donations are still open: https://www.gofundme.com/f/supporting-the-gamblen-family-and-baby-georgie

VICTORIA PLACE, BURWOOD | A 40 storey tower in Burwood's town centreVictoria Place is P&N Sleiman's mixed use precinct i...
12/11/2026

VICTORIA PLACE, BURWOOD | A 40 storey tower in Burwood's town centre

Victoria Place is P&N Sleiman's mixed use precinct in the centre of Burwood, opposite Westfield and a short walk from the station. Designed by Urban Link Architects, the precinct has three towers and a new laneway through the site. The tallest, on Victoria Street, rises 40 storeys, with more than 250 apartments above retail, workplaces and a wellness and medical centre.

The tower grew during design. It was first approved at 30 storeys, and when the scheme was upscaled through the State Significant Development pathway, our services design was reworked to carry 10 more floors. Construction is now well underway with TQM Design & Construct.

Goldfish & Bay is providing hydraulic, mechanical, electrical and fire engineering for the Victoria Street tower. In the renders, it's the one that kept growing.

Thank you to the project team for the opportunity to contribute.

Developer: P&N Sleiman
Architect: Urban Link Architects
Landscape Architect: Turf Design Studio
Builder: TQM Design & Construct

Images courtesy of P&N Sleiman Group

WHAT'S CHANGING | NCC 2025 arrives in NSW on 1 May 2027The National Construction Code 2025 was released on 1 May 2026, a...
11/11/2026

WHAT'S CHANGING | NCC 2025 arrives in NSW on 1 May 2027

The National Construction Code 2025 was released on 1 May 2026, and NSW has confirmed it will adopt it on 1 May 2027. That gives industry a 12 month transition. Until then, NCC 2022 and its NSW variations still apply.

For building services, the biggest change is commercial energy efficiency. Under Volume One Section J, new commercial buildings (Class 3 and Class 5 to 9) will need on site solar PV. The deemed to satisfy path asks for panels across the usable roof area, or a minimum output per square metre of conditioned space. For offices, shops and warehouses in Sydney, that's 65 W per square metre. Main switchboards also need spare space set aside for a future battery. Fabric and services requirements are tighter, and lighting control is stricter. Class 2 apartment buildings stay on the NCC 2022 Section J requirements, and NSW has said the new energy efficiency standards won't apply to apartment common areas.

A few other changes touch our work. Open deck carparks that aren't separate buildings will need sprinkler protection. Plastic pipes and fittings can't be used above ground in combined sprinkler and hydrant systems. Condensation management in Part F8 and water management in Section F have both been refined. And NSW will let owners doing remedial waterproofing on apartments choose between the current requirements and those in NCC 2025.

What it means for projects: in NSW, the code edition is generally set by when the construction certificate application is lodged. If a commercial project in design now won't lodge until after May 2027, confirm early which edition will apply. Roof space for solar PV is far easier to allow for at concept stage than to find in a finished design.

Sources: NCC 2025 Volume One, Australian Building Codes Board | NSW Government

Walton Street Car Park, PictonA new rooftop deck takes this Wollondilly Shire Council car park from 126 to 235 spaces, c...
10/11/2026

Walton Street Car Park, Picton

A new rooftop deck takes this Wollondilly Shire Council car park from 126 to 235 spaces, close to Picton's new Cultural Precinct.

The site is in a high flood risk area. In a 1% AEP (1 in 100 year) flood it can sit under as much as 2.35 m of water. Onsite detention, the usual tank that holds stormwater back, wouldn't work here because the tank would be under water too. So stormwater from the rooftop deck connects into Council's drainage in Walton Street.

We provided hydraulic and civil (stormwater) engineering at construction stage.

Architect: Lockhart-Krause Architects
Builder: KANE Constructions
Photos: Martin Siegner

Full project story on our website.

ENGINEERING INSIGHTS | How did a small escalator fire become a flashover in minutes?On 18 November 1987, a fire started ...
09/11/2026

ENGINEERING INSIGHTS | How did a small escalator fire become a flashover in minutes?

On 18 November 1987, a fire started beneath a wooden escalator at King's Cross Underground station in London. 31 people died, including Station Officer Colin Townsley of the London Fire Brigade.

A lit match fell into grease and debris under the steps. About 20 minutes later, flames erupted into the busy ticket hall.

Investigators identified the trench effect. In an escalator trench sloped at 30 degrees, the flames lay down along the incline, heating the steps ahead and driving fire up into the ticket hall.

The inquiry made 157 recommendations, including replacing wooden escalators.

The lesson: the shape of a space, its materials and hidden debris can all change how fast a fire grows.

Cover photo: Mavis CW, Unsplash

Full article on our website.

Australia's tallest retirement village is in Epping.The Cambridge is a 29 storey tower by Levande, with 158 independent ...
02/11/2026

Australia's tallest retirement village is in Epping.

The Cambridge is a 29 storey tower by Levande, with 158 independent living apartments above a 132 bed aged care facility run by Opal HealthCare. It was delivered with the Catholic Diocese of Broken Bay on the Our Lady Help of Christians site, around the heritage listed church, a new primary school and a parish hall.

One tower serving apartments and residential aged care at once asks a lot of the hydraulic design, from hot water to drainage and reliability. We delivered the hydraulic services design, through construction and the design changes along the way.

Designed by Architectus and built by Richard Crookes Constructions, it won Excellence in Retirement Living & Land Lease at the 2026 UDIA NSW Awards.

More on our website: https://www.goldfishandbay.com.au/post/the-cambridge-epping-australia-s-tallest-retirement-village

Image: Richard Crookes Constructions

The Empire State Building gets hit by lightning about 23 times a year, and the people inside are fine.Metal doesn't attr...
02/11/2026

The Empire State Building gets hit by lightning about 23 times a year, and the people inside are fine.

Metal doesn't attract lightning. Height and isolation do. What the steel frame does is give the current a safe path to the ground.

In Australia, AS/NZS 1768 covers lightning protection: air terminals, down conductors, earthing and surge protection. Break any one link, like a damaged conductor or new rooftop plant that was never bonded in, and the current finds its own way down.

Full story on our website: https://www.goldfishandbay.com.au/post/why-the-empire-state-building-doesnt-mind-lightning

A drawing isn't finished when the engineer stops working on it. It's finished when it's been checked, recorded and issue...
02/11/2026

A drawing isn't finished when the engineer stops working on it. It's finished when it's been checked, recorded and issued. That's Sabrina's job.

As our Document Control Manager, Sabrina and her team check every issue against the last one, hold construction drawings until the design is coordinated, and keep a record of everything we send. Nothing gets deleted.

For clients, it means the drawing on site is the right one.

Thanks, Sabrina. Your answers have been filed in the right folder.

More on our website: https://www.goldfishandbay.com.au/post/what-happens-after-the-engineer-finishes-the-drawing-sabrina-baillie

Address

1/432 Parramatta Road, Petersham
Sydney, NSW
2049

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+611300979667

Alerts

Be the first to know and let us send you an email when Goldfish & Bay posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Goldfish & Bay:

Shortcuts

Share

Nearby engineering companies