Off the cliff at Bondi.
By the 1870s, Sydney Harbour was grossly polluted. Since 1859 the city's sewage had drained through five outfall sewers straight into it.
The answer was to stop the sewage reaching the harbour at all. Between 1880 and 1889 the Public Works Department built the Bondi Ocean Outfall Sewer, an intercepting sewer that collected flows from the older city sewers and carried them east. It runs about 6.1 kilometres from the corner of Oxford and College Streets in Darlinghurst to Ben Buckler at North Bondi, where it discharged at the cliff face into the ocean.
It is lined in brick with an egg shaped cross section, 2.4 metres by 2.2 metres at the outfall end. The narrow base keeps low flows deep and fast enough to carry solids along instead of leaving them behind. The survey work was so accurate that bricklayers started lining the tunnel before the two ends had even met.
It all ran on gravity, so it could only serve land above it. Lower suburbs later needed pumping stations to lift their sewage up into the system. The sewage went into the ocean untreated until the Bondi treatment plant began partial operation in 1953. A 2.2 kilometre deepwater ocean outfall followed in 1991.
Today the sewer is on the NSW State Heritage Register as the first ocean outfall sewer of its type designed and built in Australia, and it still carries flows to the Bondi plant.
For hydraulic and civil engineers the questions haven't changed: where does it fall, what can gravity reach, and what happens when the catchment grows? The Bondi plant was designed for 250,000 people. It now serves the equivalent of more than 780,000.