Go2 Earthworks

Go2 Earthworks We're your Go2 guys for all your earthwork needs across the Eyre Peninsula!

Tight access project completed. Benching out of site on the Port Lincoln Marina for a polished raft slab and strip footi...
05/06/2026

Tight access project completed. Benching out of site on the Port Lincoln Marina for a polished raft slab and strip footings for alfresco and decking. Peter Elson Constructions

A new Ag Dealer all prepped for spray seal. Rubble keyed into the hardstand along aprons and paths , laser graded, shape...
28/05/2026

A new Ag Dealer all prepped for spray seal. Rubble keyed into the hardstand along aprons and paths , laser graded, shaped and rolled.

Not something I normally post about but here goes. Tomorrow marks ANZAC Day, a hugely poignant day here in Australia. In...
23/04/2026

Not something I normally post about but here goes. Tomorrow marks ANZAC Day, a hugely poignant day here in Australia. In 2015 we were luckily enough to visit Turkey and the Gallipoli Peninsula. Walking around Anzac Cove was eerily similar to our beaches at home. It was where my great grandfather fought and was wounded. I am tremendously proud that my kids talk about what they have learnt about our war history from school. I look forward to taking the kids again to the dawn service tomorrow.

Lest we Forget.

Are you needing some wet vac work done? Here is a recent job with a pump out sump completed using our hydro vac.
21/04/2026

Are you needing some wet vac work done? Here is a recent job with a pump out sump completed using our hydro vac.

Civil Earthworks recently completed on a 200m long, 1.2m wide concrete spoon drain at Cummins. Shoutout to Desert Craft ...
01/04/2026

Civil Earthworks recently completed on a 200m long, 1.2m wide concrete spoon drain at Cummins.

Shoutout to Desert Craft Contracting for the concrete construction and Cave Civil for a hand along the way.

We’re hiring!
22/03/2026

We’re hiring!

06/03/2026
Civil prep works for 210m of 1.2m wide concrete spoon drain is 95% complete as of today. The predicted rain for lower EP...
26/02/2026

Civil prep works for 210m of 1.2m wide concrete spoon drain is 95% complete as of today. The predicted rain for lower EP can go away pretty please!

A recent commercial septic/ enviro system in Cummins benched out. Now under going backfill and compaction.
12/02/2026

A recent commercial septic/ enviro system in Cummins benched out. Now under going backfill and compaction.

We’re hiring!Please reach out to us if you are interested or would like any more details.
08/02/2026

We’re hiring!

Please reach out to us if you are interested or would like any more details.