KingKira recently provided specialist industrial cleaning services for a valued Tier 1 mining client in the Pilbara, supporting a planned modular outage.
Our scope included cleaning two transfer chutes to an A Class standard, ready for removal during the outage, as well as clearing the associated line from the Guillotine Gate through to the chutes.
Built-up ore and fines needed to be removed before maintenance crews could safely and efficiently remove the chutes.
Using our 50-metre articulated boom truck with remote high-pressure lance head and Hammelmann high-pressure water blasting unit, our team was able to access and clean the chutes while keeping operators out of the chute and out of the line of fire.
Working within a fixed outage window, preparation was key. Equipment was set up and the high-pressure pump pre-started ahead of night shift, allowing blasting to begin as soon as permits and isolations were in place.
The result: both chutes were blasted to A Class clean safely and handed back within a single night shift, with approximately five hours of blasting time across both chutes and equipment packed up ready for the incoming removal crews.