07/07/2025
Sydenham job part 2 interior full renovation before and after : floorboard changing floor and stairs , adding walking robe downstairs with ensuite costume made vanity stone bench top and double sinks , frameless shower screen niche and feature wall tiles with tiles up to ceiling , heated towel rail (all brush gold fixtures) , adding shower and toilet upstairs , converting room with bathroom to an walking robe to walk in bathroom (brushed gold fixtures , costume made vanity with stone bench tope and sink , shaving cabinet , heated towel rails , frameless sliding shower screen , niche , feature wall tiles , tiles ip to ceiling and cavity sliding door)