31/05/2022
Wynnum Bridge
Wynnum Rugby Club was undergoing extension and refurbishment works. The extension works extended to use part of the car park for construction. To enable the rugby club to remain open to the general public a temporary bridge was needed to be constructed across a small creek. A temporary bridge that could support up to 60t vehicle loads was crucial to the successful completion of the Rugby Clubs refurbishment works. A new temporary bridge the Mabey Compact 200 ™ (C 200 ™) provided Daniels Civil with the perfect solution. A 12 metre, prefabricated bridge was assembled on site and installed ready for live traffic within two days by a team of four people and a Mabey supplied site supervisor. The bridge was 4 2 metres wide complete with Mabey SmartEdge supplied on the truss panels, configured to provide safe crossing for general public and construction vehicles up to 60t.
Australia & Mabey New Zealand
Call our Head Office
Ph: 1800 622 394