Centroid Engineers

Centroid Engineers Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Centroid Engineers, Construction Company, Cumilla.

�Architectural Drawing, Soil Test

�Interior Work.
�Material supply of interior & civil work.
�Structural Design
�Construction (Building, Road,Bridge & Jetty etc.
�Construction equipment supply.
� Sensor Supply

20/03/2026

ঈদ মোবারক

4 stroied Residential buildingKotbari, Cumilla
07/03/2026

4 stroied Residential building
Kotbari, Cumilla

সিংগাপুর প্রবাসী হাসান ভাইয়ের স্বপ্ন বাস্তবায়নের পথে❤️
12/07/2025

সিংগাপুর প্রবাসী হাসান ভাইয়ের স্বপ্ন বাস্তবায়নের পথে❤️

Lay-Out Done
11/07/2025

Lay-Out Done

Contact us for any type of home design🥰
13/07/2024

Contact us for any type of home design🥰

Some Beautiful building designs. Contact us: 01820419435
08/01/2023

Some Beautiful building designs.
Contact us: 01820419435

Alhamdulillah 5th project runningLocation: Patuakhali Contact: 01820419435
18/02/2022

Alhamdulillah
5th project running
Location: Patuakhali
Contact: 01820419435

14/08/2021

রাজউক প্লান পাসে করনীয় (শেয়ার করে টাইম লাইনে রেখে দিতে পারেন)-----

বাড়ী, ফ্ল্যাট, মার্কেট এবং এপার্টমেন্ট নির্মাণের জন্য সর্ব প্রথমে রাজধানী উন্নয়ন কর্তৃপক্ষ (রাজউক) থেকে নকশা অনুমোদন করিয়ে নিতে হয়। ১ নং ডি,আই,টি রোডে রাজউকের নিজস্ব কার্যালয় রয়েছে।

পল্টন ময়দানের বিপরীত (পূর্ব) পাশে ও বঙ্গ ভবনের উত্তর পাশে রাজউক ভবনটি অবস্থিত। এছাড়া ঢাকায় মহাখালী, হাউজ বিল্ডিং সহ কয়েকটি আঞ্চলিক এরিয়া শাখা রয়েছে।যেগুলো স্ব স্ব জোনের কার্যক্রম চলমান।

ব্যক্তি মালিকানাধীন বাড়ীর ডিজাইন পাস করতেঃ

ব্যক্তিমালিকানাধীন বাড়ীর নকশা অনুমোদন করতে রাজউকে যেসব কাগজপত্র জমা দিতে হবে তা হলো, জমি রেজিস্ট্রেশনের ফটোকপি, খাজনা, জমা, খারিজ, CS, RS, মৌজা, থানা নাম, অঙ্গীকার নামা, নির্ধারিত ফর্মে ছাড়পত্রের আবেদন ও উক্ত ফর্ম অনুযায়ী কাগজপত্র ও দলিলাদি দাখিল করতে হবে। এছাড়া ব্যাংকে নির্ধারিত ফি জমা দিতে হবে।

প্রতিষ্ঠানিক মালিকানাধীন স্থাপনার নকশা অনুমোদনঃ

প্রাতিষ্ঠানিক মালিকানাধীন স্থাপনার নকশা অনুমোদনে বরাদ্দপত্র, কিস্তি পরিশোধের রিসিট, ভূমি জরিপের নকশা, লিজ দলিল, পাওয়ার অব এ্যাটর্নী (তৃতীয় ব্যক্তিকে হস্তান্তরের ক্ষেত্রে), ছাড়পত্রের আবেদন ফরম ও উক্ত ফরম অনুসারে কাগজপত্র ও দলিলাদি দাখিল করতে হয়।

নকশা প্রণয়নে উভয় ধরনের মালিকানার করণীয়ঃ

উভয় ধরনের মালিকানাধীন স্থাপনার নকশা প্রণয়নের ক্ষেত্রে “ঢাকা ইমারত নির্মাণ বিধিমালা ২০০৮” অনুযায়ী প্লটের সামনে বিদ্যমান রাস্তার জন্য প্রযোজ্য FAR অনুসরণ করতে হবে।



এছাড়া নিম্নলিখিত ধারাগুলো অবশ্যই পালন করতে হবে
------------------------------------------------------------------------

# ৮ প্রস্থ নক্সাসহ আবেদন ছক (ফরম-৩০১) পূর্ণাঙ্গভাবে পূরণ ও স্বাক্ষর।
নক্সা প্রণয়নকারী কারিগরী ব্যক্তির পেশাজীবী সংগঠনের সদস্য নম্বরসহ স্বাক্ষর।
# বৈধ মালিকানার হাল নাগাদ দলিলাদির সত্যায়িত অনুলিপি প্রদান।

# A4 সাইজের কাগজে FAR এর হিসাব দাখিল করন।

# গভীর ভিত্তি, পাইলিং, বেজমেন্ট নির্মাণের ক্ষেত্রে নির্ধারিত ছকে (ইন্ডেমনিটি বন্ড ফরম – ৩০১) ক্ষতিপূরণ মুচলেকা প্রদান (প্রযোজ্য হলে)।

# A0-A4 সাইজে মেট্রিক ম্যাপে নক্সা প্রণয়ন ও দাখিল করন।

# নক্সায় আবেদনকারী (মালিক/আম-মোক্তার) নাম, ঠিকানা ও স্বাক্ষর প্রদান।

# ছাদের পানি নিষ্কাশন ব্যবস্থা এবং পানির লে-আউট প্রদর্শন পূর্বক প্রণীত ছাদের নক্সা।

# প্রবেশ, নির্গমন, ড্রাইভওয়ে প্রদর্শন পূর্বক পার্কিং প্ল্যান।

# ২ (দুই)টি সেকশন (লম্বালম্বি ও আড়াআড়ি)।

# সকল দিকের উন্নতি চিত্র (এলিভেশন)।

# প্লটের সীমানা রেখা হইতে নূন্যতম সেট ব্যাক প্রয়োজন।

# রাস্তার জন্য জমি হস্তান্তরের অঙ্গীকার নামা (প্রযোজ্য হলে)।

# বসবাসযোগ্য কক্ষ, রান্নাঘর ও গোসলখানা/টয়লেটের ন্যূনতম ক্ষেত্রফল ও ন্যূনতম প্রস্থ।

07/05/2021

দেশের প্রকৌশলীদের একমাত্র জাতীয় পেশাজীবী সংগঠন ইঞ্জিনিয়ার্স ইনস্টিটিউশন, বাংলাদেশের (আইইবি) ৭৩তম প্রতিষ্ঠাবার্ষিকী আজ ৭ মে। ১৯৪৮ সালের ৭ মে প্রতিষ্ঠার পর থেকে এই দিনটিকে 'ইঞ্জিনিয়ার্স ডে' হিসেবে পালন করা হয়ে থাকে।

05/05/2021

Modern House

06/04/2021

Building Item

1. Structure = 35%
2. Brick work = 6%
3. Wood work = 5%
4. Metal work = 2%
5. Plambing and Sanitary = 6%
6. Electrical work = 7%
7. Plaster work = 4%
8. General Floor Tiles work = 6%
9. Toilet & Kit wall Tiles work = 3%
10. Aluminium work = 4%
11. EME (Lift, Generator, Substation) = 10%
12. Paint work = 3%
13. Others civil work = 6%
14. Utility connection & Bill = 3%
Total = 100%

STRUCTURE 35%
- Footing & Column Padestal = 20%
- Grade Beam, UGWR top Slab = 5%
- GF Column, Stair etc = 4%
- 1st Floor Slab = 9%
- Typical Floor Column (5x3%) = 15%
- 2nd floor slab to roof slab (5x8) = 40%
- Roof top = 7%
TOTAL = 100%

BRICK WORK 6%
- GF Brick work = 6%
- 1st floor Brick work = 18%
- 2nd floor Brick work = 18%
- 3rd floor Brick work = 18%
- 4th floor Brick work = 18%
- 5th floor Brick work = 18%
-Roof Top Brick work = 4%
TOTAL = 100%

WOOD WORK 5%
- Door frame = 40%
- Main Door Shutter = 15%
- Partex Door Shutter = 35%
- Cat Door & Accessories = 10%
TOTAL = 100%

METAL WORK 2%
- Window grill = 55%
- Verandah Railling = 20%
- Stair Railling = 10%
- Main gate, Gen-Sub, safety grill = 15%
TOTAL = 100%

PLAMBING & SANITARY 6%
- uPVC vertical line thru duct = 25%
- GI line work = 30%
- Fixture & Fittings = 40%
- Ground Floor = 5%
TOTAL = 100%

ELECTRICAL - 7%
- Conduiting inside slab = 10%
- Conduiting on wall i/c MK box=15%
- Cabling work = 55%
- Switch-Socket = 20%
TOTAL = 100%

PLASTER 4%
- Ceiling plaster = 20%
- Internal wall plaster = 50%
- Outside plaster/facing bricks = 30%
TOTAL = 100%

GENERAL FLOOR TILES 6%
- General floor & Verandah = 75%
- Stair, typical lobby & lift wall = 20%
- GF lift lobby, wall, reception = 5%
TOTAL = 100%

TOILET & KIT WALL TILES = 3%
- Bath wall = 60%
- Kitchen wall = 20%
- Bath floor = 9%
- Bath counter top = 4%
- Kitchen floor = 3%
- Kitchen counter top =4%
TOTAL = 100%

ALUMINIUM WORK 4%
- Outer framing-window sliding= 40%
- Glass shutter-window sliding = 30%
- Verandah sliding = 20%
- Toilet high window = 5%
- Comnon area = 5%
TOTAL = 100%

EME 10%
- Lift = 50%
- Generator = 25%
- Substation = 20%
- PABX, Fire extinguisher etc = 5%
TOTAL = 100%

PAINT WORK = 3%
- Upto putty = 40%
- Internal wall&ceiling 1st coat= 20%
- Internal wall&ceiling 2nd coat= 15%
- Outside paint/ceramic Tites = 25%
TOTAL = 100%

OTHERS CIVIL WORK = 6%
- Boundary wall = 30%
- Line terracing/Roof top paver= 15%
- LOGO, Gardening & others = 4%
- GF BBC = 14%
- GF pavement & footpath dev = 10%
- Lintel, F/slab, drop wall, counter slab = 20%
- Cable tray = 1%
- Sanitary duct cover, ceiling etc= 4%
- Reception desk, letter box = 2%
TOTAL = 100%

UTILITY CONNECTION & BILL = 3%
- DESA/DESCO = 35%
- TITAS = 20
- WASA = 15%
- Utility bills = 30%

পদ- ইলেক্ট্রিক্যাল ইঞ্জিনিয়ার যোগ্যতা - সিভিলে স্নাতক অথবা ডিপ্লোমা। "গাঁজা কি বাসায় গিয়ে খাবেন নাকি বাসা থেকে গাঁজা খেয়...
30/03/2021

পদ- ইলেক্ট্রিক্যাল ইঞ্জিনিয়ার
যোগ্যতা - সিভিলে স্নাতক অথবা ডিপ্লোমা।
"গাঁজা কি বাসায় গিয়ে খাবেন নাকি বাসা থেকে গাঁজা খেয়ে এসেছেন" অবস্থা 😒

Address

Cumilla

Telephone

+8801811353039

Website

Alerts

Be the first to know and let us send you an email when Centroid Engineers posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Centroid Engineers:

Share