This project could’ve been a coordination disaster.
HVAC crossing beams, Pipes fighting cable trays, Fire lines with no space to pass.
And it was a 350,000+ sft industrial facility.
Fixing this on-site would’ve meant delays, rework, and money lost.
So we did something smarter.
We built everything digitally first.
Every duct.
Every pipe.
Every system.
Clashes solved before construction.
Not during construction.
Result?
✅ Cleaner installation
✅ Faster ex*****on
✅ Less rework
✅ Happier client
That’s the power of BIM when it’s done right.
📍 EGMCL Unit 7 – Full case study:
https://lnkd.in/gzPsvJyA
If you’re handling complex MEP/industrial projects, what’s your biggest coordination headache right now?
Let’s talk in the comments.
— Team INCOMPLEX