BeSteel Light steel framing

BeSteel Light steel framing At beSteel, we fully believe in the future of steel frame construction, a revolutionary alternative to traditional construction methods.

Fast, light and extremely durable: your construction project will take a big leap in all areas. beSteel is a proud member of the BuildUp company.

06/05/2026

beSteel by Sweelco: Historic expertise finds a new momentum. 🚀

Since its inception, beSteel Light steel framing has been the pioneer of light gauge steel framing in Europe. Today, a new chapter opens. Sweelco, created and led by Damien Muller and Pierre Rougeulle, takes over the assets and extends the expertise and activities developed within beSteel, which now becomes beSteel by Sweelco.

This milestone is a promise of continuity. 🤝

By joining SWEELCO, beSteel's expertise gains a new momentum:

🌍 A European ambition: By bringing together our respective territories, Sweelco becomes a leading player in Europe, backed by a multiplied industrial and logistics capacity.

🎯 15 years of combined expertise: By uniting our know-how, we build on 15 years of innovation and real-world experience in the most demanding markets to deliver ever more reliable solutions.

🔥 An expanded profile range: We now produce a complete range of sections, from C50 (0.7 mm) for lightweight solutions to C350 (2 mm) for long-span structures.

From now on, the Sweelco team will be your new point of contact. You will find a team of passionate professionals dedicated to bringing you the technical precision and agility needed to make your projects a success.

🙏 A heartfelt thank you to everyone who entrusted us with their projects, their challenges, and their confidence. More than a simple handover, this is a continuity of the heart: you are now in the hands of a team that shares our passion and will, with the same care, carry your ambitions even further.

Historic expertise meets the ambition of tomorrow to keep building a "Light, Fast & Circular" future.

This project came with a challenge: strong windloads on the long side of the building.Our solution? A mix of HRS and Dur...
20/10/2025

This project came with a challenge: strong windloads on the long side of the building.

Our solution? A mix of HRS and Durelis plates, nailed every 50mm for maximum stiffness.

But here’s the real interesting part..

🛠️ The entire installation took just 3 days.

Because that’s what steel framing does best:

🔹 Tackles complex structural needs with ease

🔹 Speeds up your timeline

🔹 Cuts out the mess of traditional builds

From clever detailing to rapid assembly, we simplify your building process: and help you .

Time for the little steel fact of the month : "You never change things by fighting the existing reality. To change somet...
15/10/2025

Time for the little steel fact of the month :

"You never change things by fighting the existing reality. To change something, build a new model that makes the old model obsolete."

Architect, inventor, radical thinker, Buckminster Fuller imagined structures that were light, modular, and resource-efficient long before the industry caught up. His geodesic dome in the 60s became a symbol of structural intelligence:

🔹 Ultra-light yet incredibly strong

🔹 Quick to assemble

🔹 Minimal material, maximum performance

At beSteel, we don’t build domes, but we share the same mindset.
We believe in building systems that are light, precise, and future-ready, just like Fuller imagined during his life.

Think comfort needs thicker walls? Think again. 😉🐝 Beeldy is back to explain why beSteel’s thinner steel walls give you ...
30/09/2025

Think comfort needs thicker walls? Think again. 😉

🐝 Beeldy is back to explain why beSteel’s thinner steel walls give you more space, more insulation, and more comfort, all in less thickness.

👉 Swipe left to see the 6 smart reasons why thinner can actually be better.

The planet’s under construction too! 🌍🛠️The construction industry is one of the biggest polluters on Earth. But at beSte...
25/09/2025

The planet’s under construction too! 🌍🛠️

The construction industry is one of the biggest polluters on Earth. But at beSteel, we’re not just building houses, we’re building a better way forward.

♻️ Steel frames with up to 42% recycled content

♻️ 90% less waste thanks to precise offsite production

♻️ Dry construction system = no concrete, no water, no mess

Lightweight, recyclable, efficient. That’s not just good for your project. That’s good for the planet. 🌱

🫶 They don’t pose in the pictures. But without them, projects wouldn’t exist.The ones behind the screens, in the factory...
23/09/2025

🫶 They don’t pose in the pictures. But without them, projects wouldn’t exist.

The ones behind the screens, in the factory, on the phone, under pressure and still smiling.

🔹 Morning shift triple-checking each panel

🔹 Engineer reworking a detail at 9 PM, just to be sure

🔹 Planner rearranging deliveries to keep the site on track

🔹 Factory team making heavy lifting look light

These people? They just make things work. Fast, safe, well.

Thank you !

Discover more about beSteel and our story here: https://be-steel.eu/en/our-story/

410 days. That’s all it took to build the Empire State Building. 🏙️Completed in 1931, this landmark skyscraper rose in j...
17/09/2025

410 days. That’s all it took to build the Empire State Building. 🏙️

Completed in 1931, this landmark skyscraper rose in just 13 months. Long before BIM or modular construction, it was already a pioneer in prefabrication and logistics:

✔️ Pre-fabricated steel frames delivered ready to assemble

✔️ Façade elements (stone, spandrels, windows) produced off-site

✔️ Standardized, repetitive floors allowing industrialized speed

✔️ Supply chains and labor shifts coordinated with military precision

At times, the steel structure advanced 4 floors per week.

Back then, they built fast with the tools they had.

Today, with light steel framing, digital tools, modular systems, we can go further: faster, cleaner, smarter.

Learn more about how we reduce steps of a project thanks to offsite construction: https://be-steel.eu/en/steps-of-a-project/

  is rising 🚧 ◻️   Prefabricated walls, floors, and roofs arrive ready to install, with the beSteel Fastwall system insi...
11/09/2025

is rising 🚧

◻️ Prefabricated walls, floors, and roofs arrive ready to install, with the beSteel Fastwall system inside.

Soon, 7 buildings will house 73 homes and 6 workshops, built for the city and its people.

And the best part ? the city keeps breathing, even while we build.

Designed by NG Architectes, developed by Midi Développement, and built for SLRB, with Meccabuild innovative offsite system and our light steel frame technology.

Adres

Nieuwlandlaan 39 (B224)
Aarschot
3200

Openingstijden

Maandag 08:30 - 17:00
Woensdag 08:30 - 17:00
Donderdag 08:30 - 17:00

Telefoon

+3216151210

Meldingen

Wees de eerste die het weet en laat ons u een e-mail sturen wanneer BeSteel Light steel framing nieuws en promoties plaatst. Uw e-mailadres wordt niet voor andere doeleinden gebruikt en u kunt zich op elk gewenst moment afmelden.

Contact

Stuur een bericht naar BeSteel Light steel framing:

Delen