HC Joints

HC Joints Dilatatievoegen voor industrievloeren

To handle concentrated 170 kN wheel loads from heavy 46-tonne forklifts, the initial structural design for a 31,000 m² h...
03/09/2026

To handle concentrated 170 kN wheel loads from heavy 46-tonne forklifts, the initial structural design for a 31,000 m² heavy industrial facility specified a 300 mm thick slab with conventional dowelled joints.

However, a structural verification according to TR34 (4th Ed.) proved that by implementing the continuous 3D load transfer of Cosinus Slide®, the required slab depth could be safely optimized to 250 mm while maintaining a full 20% safety margin:

📏 -50 mm Slab Optimization (300 mm → 250 mm across 31,000 m²)
💶 €61,200 Net Material Cash Saved (Concrete & steel reinforcement)
🌍 -309.4 Tonnes Embodied CO₂ Cut (-16.7% carbon footprint)
🛡️ 100% Zero Joint Spalling & Shock-Free Transit
🚛 46-Tonne Forklift & AGV Certified

Read the complete engineering audit and calculate potential concrete & cost savings for your project parameters with our interactive estimator:

👉 Full Case Study & Calculator: https://www.hc-joints.com/reducing-industrial-floor-slab-thickness-5-cm-cosinus-slide

Good exhibitions are about people, not just products.Together with RYMCO TRADING, we had the opportunity to meet many in...
20/08/2026

Good exhibitions are about people, not just products.

Together with RYMCO TRADING, we had the opportunity to meet many industry professionals at Expo Transporte y Expo Logísti-K 2026.

The response to Cosinus Slide® was very positive, and we are excited about the relationships and opportunities that started in Buenos Aires.
Thank you to everyone who visited the booth and shared their insights with us.

hashtag hashtag hashtag hashtag

13/08/2026

Another shipment of Cosinus Slide® joints is on its way to our client Litos in Texas.

We are proud to support a project that sets high standards for industrial flooring, with floor load capacities reaching 15 t/m². Cosinus Slide® helps ensure long-term durability and reliable performance under demanding warehouse and logistics operations.

Contact our team to learn how Cosinus Slide® can improve the durability and performance of industrial floors. https://www.hc-joints.com/contact

HCJ is proud to support the construction of the new Ciner Glass production facility in Lommel, Belgium, by supplying ove...
06/08/2026

HCJ is proud to support the construction of the new Ciner Glass production facility in Lommel, Belgium, by supplying over 1 kilometre of Cosinus Slide® Sealed joints.

Designed for long-term performance in demanding industrial floors, the Cosinus Slide® Sealed system delivers smooth traffic transfer, durability, and reliable protection throughout the lifecycle of the floor.

With deliveries planned over the coming six months, this project represents another strong reference for HCJ and confirms the growing trust placed in our innovative joint solutions by leading industrial manufacturers.

👉 Planning a new logistics, manufacturing, or distribution facility? Contact our team to discover how HCJ joint solutions can improve floor performance, durability, and operational efficiency from day one https://www.hc-joints.com/contact

See you in Buenos Aires! 🇦🇷We're pleased to join our partner RYMCO TRADING S.A. de C.V.- Official at Expo Transporte y E...
30/07/2026

See you in Buenos Aires! 🇦🇷

We're pleased to join our partner RYMCO TRADING S.A. de C.V.- Official at Expo Transporte y Expo Logísti-K 2026 and share solutions built for the demands of modern logistics facilities.

📅 11-13 August 2026
📍 La Rural, Buenos Aires, Argentina
📌 Booth 3122

We look forward to connecting with industry professionals and discussing how Cosinus Slide® helps create durable, efficient, and low-maintenance industrial floors.

16/07/2026

Build a warehouse that doesn't limit your growth.

A high-performance warehouse floor must meet two non-negotiable standards: it must be low-maintenance and fully adaptable to your layout.

The Cosinus Slide® system is engineered to deliver exactly this performance:

👉 Eliminate Maintenance: Failing joints cause damage to concrete and destroy forklift wheels. The Cosinus Slide® system removes the impact, preventing the wear and tear that leads to costly repairs and operational downtime.

👉 Maximise Layout Freedom: Traditional joints create "restricted zones" that dictate where your racks can be placed. Our technology allows you to design your layout with total freedom and gives you the agility to reposition racking anytime your business needs change.

See how we’re optimizing warehouse efficiency in this 2-minute video.

Ready to upgrade your flooring standards? Visit our website at www.hc-joints.com or contact our team directly.

COSINUS SLIDE® joint selected for the Koskela tram maintenance facility in Helsinki.Designed to manage structural moveme...
08/06/2026

COSINUS SLIDE® joint selected for the Koskela tram maintenance facility in Helsinki.
Designed to manage structural movements while protecting concrete edges under heavy service and rail maintenance loads — delivering long‑term performance in the most demanding environments

In cooperation with our sales partner, Semtu Oy, Finland

👉 Talk to our experts about joint design for high‑load infrastructure projects https://www.hc-joints.com/contact

🇧🇷🤝🇧🇪 From Brazil to GenkTraining in Genk, followed by a visit to the Skechers project in Liège —together with PSE DO BR...
28/05/2026

🇧🇷🤝🇧🇪 From Brazil to Genk
Training in Genk, followed by a visit to the Skechers project in Liège —
together with PSE DO BRASIL, turning knowledge into real-world application.

Get in touch to learn more. https://www.hc-joints.com/

Exciting news from the HCJ family! 🙌Please join us in welcoming Daniel Seffrin Bagesteiro, who has joined us as Sales Ma...
21/05/2026

Exciting news from the HCJ family! 🙌

Please join us in welcoming Daniel Seffrin Bagesteiro, who has joined us as Sales Manager LATAM.

Daniel joins HCJ with nearly 20 years of experience in international business development and export management. Having previously led successful market expansions for major players like Grupo Tigre, he brings a deep understanding of complex markets and industrial distribution to our team.

We are thrilled to have your leadership on board, Daniel. Welcome to the team! 🚀

12/05/2026

How simple can a full-depth joint repair be when everything is designed to work together?

In this video, we show the step-by-step installation process of our Industrial Floor Repair Kit — developed as a true one-stop solution for repairing damaged concrete floor joints.
No missing components. No uncertainty on site.

Just one complete system, ready to install.
🔧 All required materials in one kit
🔧 Clear, structured installation process
🔧 Engineered for heavy-duty industrial environments
🔧 Reliable and consistent repair results

Because efficient repairs start with having everything you need — in one place.

👉 Learn more:
https://www.hc-joints.com/products/side-products/industrial-floor-repair-kit

Adres

Hengelhoefstraat 158
Genk
3600

Openingstijden

Maandag 07:30 - 17:00
Dinsdag 07:30 - 17:00
Woensdag 07:30 - 17:00
Donderdag 07:30 - 17:00
Vrijdag 07:30 - 17:00

Telefoon

+32-89.32.39.80

Meldingen

Wees de eerste die het weet en laat ons u een e-mail sturen wanneer HC Joints nieuws en promoties plaatst. Uw e-mailadres wordt niet voor andere doeleinden gebruikt en u kunt zich op elk gewenst moment afmelden.

Contact

Stuur een bericht naar HC Joints:

Snelkoppelingen

Delen