Dadasov Construct

Dadasov Construct Construction company in Belgium. ๐Ÿ—
HVAC professional installer
Total completed projects 181๐Ÿค
- We work throughout Belgium โš’๏ธ

Construction site: Globetrotter ๐Ÿ—๏ธA new faรงade ventilation system is being installed on the building ๐Ÿงฐ. The perforated m...
12/06/2026

Construction site: Globetrotter ๐Ÿ—๏ธ

A new faรงade ventilation system is being installed on the building ๐Ÿงฐ. The perforated metal ducts are visible from the outside ๐ŸŒ€.

The work is neat, with verification of airtightness along the routes ๐Ÿ”โœ…. Inside the covered portion of the room, mounting holes for the ventilation ducts and blanks for future sections are evident ๐Ÿงฐ๐Ÿ”ฉ.

This configuration provides effective supply and exhaust ventilation: air is brought into the space through the pipes and expelled back out, maintaining optimal air exchange, microclimate, and safety ๐ŸŒฌ๏ธ๐Ÿข๐Ÿ”’.

It is important to ensure airtight connections, proper placement of dampers, and secure mounting to load-bearing elements so the system operates without losses and with minimal noise ๐Ÿงฐ๐Ÿ”—๐Ÿ”Š.

Tubize Construction Site ๐Ÿ—๏ธPrecision, reliability, and clean ex*****on โ€” another rooftop ventilation project completed b...
05/06/2026

Tubize Construction Site ๐Ÿ—๏ธ

Precision, reliability, and clean ex*****on โ€” another rooftop ventilation project completed by our team in Belgium ๐Ÿ‡ง๐Ÿ‡ช

From the installation of air handling units โ„๏ธ to the assembly of galvanized duct systems ๐Ÿ”ฉ, every element was mounted with attention to durability, airflow efficiency ๐ŸŒฌ๏ธ, and long-term performance.

Our specialists ensured accurate alignment ๐Ÿ“, secure support placement ๐Ÿงฑ, and a clean rooftop layout ๐Ÿข to guarantee both functionality and easy future maintenance ๐Ÿ”ง

Industrial ventilation requires more than just installation โ€” it requires planning ๐Ÿ“ and experience ๐Ÿ’ก

In our work, itโ€™s not only about delivering results quickly โšก and with high quality โœ…, but also about respecting and pre...
25/05/2026

In our work, itโ€™s not only about delivering results quickly โšก and with high quality โœ…, but also about respecting and preserving the work of other professionals ๐Ÿค

On one of our recent projects ๐Ÿ—๏ธ, we had to lift ventilation components onto a completed roof with an installed green surface ๐ŸŒฑ.

To prevent any damage, we carefully prepared the area in advance by placing pallets and wooden supports ๐Ÿชต, and only then proceeded with lifting and positioning the materials ๐Ÿš›โฌ†๏ธ

All elements were handled and arranged with care to eliminate any risk of scratches, impacts, or pressure on the surface ๐Ÿ›ก๏ธ

We always follow one principle:
quality is not just the final result โœจ, but also the process ๐Ÿ”ง

Safety compliance โ›‘๏ธ and respect for other subcontractorsโ€™ work ๐Ÿ‘ท are an essential part of what we do.

๐Ÿ—๏ธ Construction Site  Liege๐Ÿ“ธ The photographs show sections of an engineering shaft with installed round metal air ducts ...
22/05/2026

๐Ÿ—๏ธ Construction Site Liege

๐Ÿ“ธ The photographs show sections of an engineering shaft with installed round metal air ducts and adjacent engineering communications โš™๏ธ. The installation was carried out in confined conditions using connection clamps, support platforms, and fastening elements fixed to the building structures ๐Ÿ”ฉ๐Ÿข. Air duct passages through floors and walls, as well as connections to existing engineering systems, are also visible ๐ŸŒฌ๏ธ๐Ÿงฑ.

๐Ÿ” Based on the visual inspection, it is recommended to pay attention to the quality of joint connections, the airtightness of the air ducts, the reliability of the fastening systems, the absence of mechanical damage, and compliance with the designed routing layout โœ….

Construction site: Terra Noasta ๐Ÿ—๏ธModern ventilation and air conditioning system in the installation phase ๐Ÿ—๏ธโ„๏ธ๐ŸŒฌ๏ธThe pho...
15/05/2026

Construction site: Terra Noasta ๐Ÿ—๏ธ

Modern ventilation and air conditioning system in the installation phase ๐Ÿ—๏ธโ„๏ธ๐ŸŒฌ๏ธ
The photos show the installation process of external air ducts and HVAC equipment on a commercial building. All system components are carefully placed on the roof in compliance with technical standards and safety requirements โš™๏ธ๐Ÿ› ๏ธ

Special attention is given to installation quality: airtight connections ๐Ÿ”ฉ, reliable fastening of air ducts, and proper arrangement of engineering networks will ensure efficient system operation, stable fresh air supply, and a comfortable indoor climate in the building ๐ŸŒฌ๏ธ๐Ÿข๐Ÿ˜Š

Construction site โ€” Charleroi ๐Ÿ—๏ธThe photos show the installation process of a modern ventilation system in a commercial ...
08/05/2026

Construction site โ€” Charleroi ๐Ÿ—๏ธ

The photos show the installation process of a modern ventilation system in a commercial space ๐ŸŒฌ๏ธ. Main galvanized steel air ducts are visible, neatly mounted under the ceiling, along with distribution elements such as an air diffuser, ensuring even air supply throughout the space.

Special attention has been paid to the quality of installation ๐Ÿ”ง: all connections are airtight, the duct routes are aligned precisely, and all work complies with the project specifications ๐Ÿ“. Elements of a supply and exhaust unit can also be seen, as well as sound-insulated sections of the ductwork ๐Ÿ”‡, indicating a well-designed system aimed at creating a comfortable indoor climate ๐ŸŒก๏ธ.

Such a ventilation system ensures efficient air exchange, maintains optimal temperature and humidity levels, and is especially important for both working and living environments ๐Ÿข๐Ÿ .

Construction Site Terra Noastra ๐Ÿ—๏ธThe installation of ventilation system elements has been completed โœ…: metal air ducts,...
01/05/2026

Construction Site Terra Noastra ๐Ÿ—๏ธ

The installation of ventilation system elements has been completed โœ…: metal air ducts, fittings, elbows, and outlets through the roof/technical shafts have been installed. The system is designed to provide air supply and exhaust from the premises, ensure air exchange, and maintain a normal indoor microclimate ๐ŸŒฌ๏ธ๐Ÿข

Based on the photos, the air ducts have been installed in a confined space, secured with brackets ๐Ÿ”ง, and penetrations through walls and floors have been completed. The external sections have been sealed with protective elements ๐Ÿ›ก๏ธ. To complete the works, it is recommended to check the airtightness of the joints, the quality of the fixings, the insulation of the penetrations, and compliance with the ventilation design scheme ๐Ÿ“‹โœ….

Sharleroi Construction Site ๐Ÿ—๏ธThe photo shows the installation of a ventilation system ๐ŸŒฌ๏ธ during the construction phase....
24/04/2026

Sharleroi Construction Site ๐Ÿ—๏ธ

The photo shows the installation of a ventilation system ๐ŸŒฌ๏ธ during the construction phase. Round and rectangular air ducts ๐Ÿ”„ made of galvanized steel are used, mounted on hangers under the ceiling. Some of the ducts are insulated โ„๏ธ to prevent heat loss and condensation ๐Ÿ’ง.

Other engineering systems are also visible, such as electrical cables โšก and fire protection pipes ๐Ÿš’, indicating a comprehensive installation of utilities. A suspended ceiling framework and an air diffuser ๐ŸŒซ๏ธ for air distribution have been installed.

Overall, the system is neatly assembled โœ… and will ensure efficient air exchange ๐ŸŒฌ๏ธ

Installation of a ventilation system at a facility in Hornu.The photo shows a ventilation system at the installation sta...
18/04/2026

Installation of a ventilation system at a facility in Hornu.

The photo shows a ventilation system at the installation stage ๐Ÿ—๏ธ. Air ducts with thermal insulation are visible, which reduces heat loss and prevents condensation โ„๏ธ. The system includes supply and exhaust channels for air circulation ๐ŸŒฌ๏ธ. Such ventilation ensures a comfortable indoor climate and provides fresh air to the ะฟะพะผะตั‰ะตะฝะธะต ๐ŸŒฟ.

Iniversales Park 2 ProjectThe photo shows a ventilation system during the installation phase inside the ะฟะพะผะตั‰ะตะฝะธั ๐Ÿ”ง๐Ÿ—๏ธ. A...
10/04/2026

Iniversales Park 2 Project

The photo shows a ventilation system during the installation phase inside the ะฟะพะผะตั‰ะตะฝะธั ๐Ÿ”ง๐Ÿ—๏ธ. Air ducts made of galvanized steel are partially insulated ๐Ÿงฑ and installed both openly and concealed within the structures.

Round and rectangular ducts with fittings are used, mounted on hangers ๐Ÿช. A motorized damper โš™๏ธ๐Ÿ”Œ has been installed to regulate airflow ๐ŸŒฌ๏ธ.

The installation is not yet complete ๐Ÿšง: the system still requires sealing , insulation ๐ŸงŠ, and final finishing.

Adres

Basiliekstraat 102/01
Halle-Booienhoven
1500

Openingstijden

Maandag 09:00 - 17:00
Dinsdag 09:00 - 17:00
Woensdag 09:00 - 17:30
Donderdag 09:00 - 17:30
Vrijdag 09:00 - 17:30

Telefoon

+32456331273

Meldingen

Wees de eerste die het weet en laat ons u een e-mail sturen wanneer Dadasov Construct nieuws en promoties plaatst. Uw e-mailadres wordt niet voor andere doeleinden gebruikt en u kunt zich op elk gewenst moment afmelden.

Contact

Stuur een bericht naar Dadasov Construct:

Delen