CE+T Power

Appeler Itinéraire Site Web Contacter l'entreprise

CE+T Power Leading Conversion Technology for Power Resilience

What does a DC grid look like in real life? ⚡That was exactly the setting of DC Grids 2026, hosted at the Transfo Zweveg...
16/10/2026

What does a DC grid look like in real life? ⚡

That was exactly the setting of DC Grids 2026, hosted at the Transfo Zwevegem site, home to the RE/SOURCED low-voltage DC grid.

Unlike a traditional AC grid, RE/SOURCED uses a DC backbone to connect renewable generation, battery storage and different energy assets, creating a real-life environment to explore how DC can contribute to tomorrow’s energy systems. CE+T acts as system integrator for the project.

During the event, Benoît Bidaine shared CE+T’s experience in operating an LVDC system, while Marc Van Goidsenhoven and Benoit welcomed visitors at our stand. Cédella Schreiner also supported technical demonstrations and guided site visits.

👉 Discover RE/SOURCED and CE+T’s contribution: https://www.cet-power.com/en/re-sourced-project/

CE+T Group is proud to be a finalist Entrepreneur of the Year® - l'Entreprise de l'Année® 2026 🏆Being among the four fin...
13/10/2026

CE+T Group is proud to be a finalist Entrepreneur of the Year® - l'Entreprise de l'Année® 2026 🏆

Being among the four finalists is a recognition of the growth of our group, our commitment to innovation, and the dedication of the people who make our success possible every day.

We are honoured to share this adventure with our fellow finalists Bruyerre, Dedecube and Groupe Jean Nonet. Thank you to EY and its partners for celebrating entrepreneurship and innovation in Belgium 💡

We look forward to the final award ceremony on 7 December 2026 📅

🚨 When the lights go out, safety can't. Reliable emergency lighting depends on one thing: a power system you can trust. ...
12/10/2026

🚨 When the lights go out, safety can't.

Reliable emergency lighting depends on one thing: a power system you can trust. In our latest customer story, discover how CE+T Power and ETAG worked together to deliver a robust solution designed to ensure continuous operation when it's needed most. ⚡

Curious to see the results? 👉 Read the full case study: https://www.cet-power.com/en/news/illuminating-safety-cet-power-and-etags-impact/

⚡ Energy storage isn't just about storing energy anymore. It's about making every kWh work harder.With Prisma Storage, C...
08/10/2026

⚡ Energy storage isn't just about storing energy anymore. It's about making every kWh work harder.

With Prisma Storage, CE+T Power helps organizations optimize self-consumption, reduce peak demand costs, improve resiliency, and unlock new value from their energy assets. 🌱

Designed around a modular and scalable architecture, Prisma connects batteries, renewable energy sources, and loads into one flexible platform, helping businesses adapt to today's challenges while preparing for tomorrow's opportunities.

👉 Discover Prisma Storage, currently available in 250 kW, 500 kW, and 1 MW: https://www.cet-power.com/en/family/prisma/

02/10/2026

⚡ A battery without an efficient PCS is just an expensive container.
Harsh? Maybe.

But as energy systems become more complex, the PCS is increasingly what determines the flexibility, efficiency, and long-term value of a project.

That is why we have spent years designing power conversion systems that adapt to your project, not the other way around.

A few thoughts from the CE+T team in the video below. 👇

⚡ When uptime is critical, proven matters.The FLEXA 200 UPS has been protecting critical applications around the world f...
28/09/2026

⚡ When uptime is critical, proven matters.

The FLEXA 200 UPS has been protecting critical applications around the world for years, delivering the reliability, flexibility, and efficiency operators need to keep their systems running.

✅ No single point of failure
✅ Hot-swappable modules for simplified maintenance
✅ Up to 98% efficiency with SBP
✅ 0 ms transfer time for critical loads
✅ Modular scalability to support future growth

Built for today's requirements, ready for tomorrow's challenges.
Interested? Get in touch with us: https://lnkd.in/d_WFnpZ

During Mobility Week, every ride counts 🚲 At CE+T Power, active mobility is more than a one-week initiative. Many collea...
21/09/2026

During Mobility Week, every ride counts 🚲

At CE+T Power, active mobility is more than a one-week initiative. Many colleagues cycle or walk to work throughout the year, making sustainable commuting part of our daily culture.

This weekend, some of them took it a step further by participating in the Assaut Mosan, an event that brings together cycling enthusiasts in a friendly atmosphere while supporting charitable initiatives. Alpha Innovations S.A. Innovations is one of the event's long-standing sponsors.

Congratulations to our riders from CE+T Power and CE+T Group who proudly represented the Group on the trails: Ben Hayen, Damien Maquet, Thierry Joannes, Felipe Pinan-Diaz and Michel Vlémincq.

Whether it's cycling to work, walking to a meeting, or taking part in events like the Assaut Mosan, every kilometer matters.

Our doors are always open🚪  We were delighted to welcome representatives from PT. Trikarya Abadi Prima and InJourney Air...
19/09/2026

Our doors are always open🚪

We were delighted to welcome representatives from PT. Trikarya Abadi Prima and InJourney Airports to our headquarters in Wandre.

While virtual meetings keep projects moving, nothing replaces the value of walking through a facility, seeing solutions in action, and exchanging ideas directly with the teams who design, build, and support them.

During their visit, our guests discovered how CE+T develops and manufactures its power conversion solutions, explored PRISMA, and observed a system configured for their application operating in real conditions.

Thank you for the engaging discussions and for taking the time to visit us. We look forward to continuing the journey together.


RESA selects CE+T Power and CE+T Services to support the reliability of its critical substation power systems ⚡The Wallo...
16/09/2026

RESA selects CE+T Power and CE+T Services to support the reliability of its critical substation power systems ⚡

The Walloon network operator chose CE+T Power to provide the power systems and CE+T Services to deliver maintenance and field support for the 110VDC, 48VDC and 24VDC rectifier and battery systems installed across its remotely monitored high-voltage substations.

More than a contract, this project reflects the value of combining reliable technologies with local service expertise. By bringing together our power conversion know-how and field service capabilities, we help ensure the continuity and resilience of critical electrical infrastructure.

For utilities, reliability is not only about equipment performance. It's also about having the right people, skills and support in place throughout the lifetime of an installation.

🚆 Rail networks are under constant pressure to become more reliable, more efficient, and more sustainable.Behind every m...
14/09/2026

🚆 Rail networks are under constant pressure to become more reliable, more efficient, and more sustainable.

Behind every metro system, signalling network, telecom infrastructure, and railway substation lies one critical requirement: uninterrupted power. ⚡

At CE+T Power, we help rail operators keep critical systems running with high-efficiency power conversion solutions designed for demanding transportation environments. From metros to national railway infrastructures, our technologies contribute to safer, more resilient, and future-ready networks.

Interested in discussing the challenges facing the rail industry?

Meet our team, together with our sister companies Alpha Innovations S.A. Innovations and Gertek Gerätetechnik GmbH, at Hall 22 - Stand 420 during InnoTrans 2026 in Berlin. 🚉
🗓️ September 22-25, 2026
📍 Hall 22, Stand 420, Messe Berlin, Germany

📖 Explore our transport solutions: https://www.cet-power.com/en/market/transport/
📄 Download our Railway brochure:https://cdn.cet-power.com/uploads/2024/12/2400870-Brochure-railways-A4-EN.pdf

Adresse

Rue Du Charbonnage 12
Wandre
4020

Heures d'ouverture

Lundi 08:00 - 17:00
Mardi 08:00 - 17:00
Mercredi 08:00 - 17:00
Jeudi 08:00 - 17:00
Vendredi 08:00 - 17:00

Téléphone

+3243456700

Notifications

Soyez le premier à savoir et laissez-nous vous envoyer un courriel lorsque CE+T Power publie des nouvelles et des promotions. Votre adresse e-mail ne sera pas utilisée à d'autres fins, et vous pouvez vous désabonner à tout moment.

Contacter L'entreprise

Envoyer un message à CE+T Power:

Raccourcis

Partager