Wind Mast Europe

Wind Mast Europe Design, manufacture and installation of wind measurement masts and 160 m. Our technical support will guarantee you security and reliable results.

We are Power to Wind – a Bulgarian company with a mission to provide the necessary technical equipment for your future wind park on the territory of the Republic of Bulgaria and the Republic of Romania. We design, produce, install and maintain wind measurement masts, which we equip with the most innovative measurement technologies. Our team consists of an electrical engineer, constructor- engineer

, civil engineer, geologist, hydrogeologist and wind measurement specialists – all proven and certified professionals in their fields. Once you contact us, with the help of our consultant we will specify the location, altitude, terrain and all other important details related to the objectives of your wind survey. Our company specializes in the design, production and installation of wind masts, offering heights of 105m, 120m, 125m, 140m. Each mast project is designed individually, taking into account the specific characteristics and requirements of the terrain where it will be located. In the process of manufacturing the masts, we use materials that meet the highest global standards in the industry with the accompanying certificates. This ensures that every mast we design and manufacture meets all safety and reliability requirements. We will transport the wind measuring mast with the necessary equipment to the selected location where we will begin the installation process. If necessary, we build more massive foundations in order to ensure the stability of the mast. A separate fundament is build for each stabilizing structure to guarantee the reliability of the installed mast. We will supply and install the necessary calibrated equipment for the purposes of your wind project. You will receive comprehensive data analysis, daily reports with measurement results, continuous sensor monitoring and wind resource assessment. For wind measurement purposes, we will supply you with the highest quality equipment including 4G/3G modem, Data logger, Air pressure sensor, Anemometer, Wind Vane, Temperature/Humidity sensor, which are designed to provide accurate and reliable data about the direction and velocity of the wind, temperature, humidity and solar radiation. We offer preventive and corrective site maintenance ensuring the trouble-free operation of sensors and wind measurement equipment.

25/05/2024
23/05/2024

"Power to Wind" and "Power to X," were general sponsors of the initiative "Road to the Stars", organized by "Bulgarian Football Tournaments" and legendary Bulgarian footballer Hristo Stoichkov's brand "H8S" and supported by the munincipality of Pleven. "Power to Wind" and "Power to X" have construct

11/05/2024

On May 22, a children's soccer tournament will be held in the city of Pleven, at the main square of the city "Vazrazhdane". Children in the 2nd grade from schools all around Pleven will participate in the tournament. The football field measures 15x10m, and the teams consist of 3 players. Organize

17/04/2024

At Power to Wind, our commitment to delivering reliable and accurate wind measurement data goes beyond the installation of our wind measurement masts. We understand the importance of ensuring the reliability of our anemometers, the instruments responsible for capturing crucial wind speed and directi

17/04/2024

At Power to Wind, we believe that the preservation of nature and wildlife is paramount to our mission of advancing renewable energy solutions. As advocates for environmental protection, we recognize the crucial role that wildlife plays in maintaining the delicate balance of ecosystems. The import

Wind measurement masts manufacturer
13/04/2024

Wind measurement masts manufacturer

Wind Europe's Annual Event in Bilbao 2024
02/04/2024

Wind Europe's Annual Event in Bilbao 2024

In the period from 20.03.24 to 22.03.24 Wind Europe's annual exhibition and conference about wind energy sector took place in Bilbao. Thousands of visitors and participants from various fields in the wind energy sector - leading companies, startups, politicians, associations, students took part in t

19/02/2024
https://www.youtube.com/watch?v=trbXXWtcooA
14/02/2024

https://www.youtube.com/watch?v=trbXXWtcooA

We are Power to Wind – a Bulgarian company with a mission to provide the necessary technical equipment for your future wind park on the territory of the Repu...

14/02/2024

MAINTENANCE OF WIND MEASUREMENT MASTS
We conduct regular inspections on and off the site in order to make assure the sensors and equipment work properly. Inspections include:



-Bolt torque check of mast bolts.

-Inspection of surfaces.

-Inspection of fall arrest systems including bolt torque checks.

-Inspection of access ladder including bolt torque checks

-Visual Inspection of structural elements

-Visual inspection of welded connections

-Visual inspection of instrumentation including bolt torque check

-Visual inspection of instrumentation booms and brackets including bolt torque check

-Visual inspection of lightning protection cables, finial and finial frame

-Visual inspection of supplementary bonding

-Ground earth resistance checks of surrounding ground

-Assessment of access and egress around base of mast

-Assessment of anti-climb and security system



We have 24/7 monitoring of the structure and equipment to help us strictly observe any potential malfunction. In case we detect any of the installed sensors or equipment requires an emergency repair, we will fix the malfunction within the span of 48 hours.

14/02/2024

DELIVERY OF WIND MEASUREMENT MASTS
To provide the best analysis for your future wind park we use the top-tier equipment, calibrated and verified by the manufacturer backed by necessary documentation. We will transport the wind measuring mast’s equipment to the chosen location where we will start the installation process. The installation is conducted precisely with compliance to most strict safety standarts.

14/02/2024

INSTALLATION OF WIND MEASUREMENT MASTS
The process of installing your wind measuring mast involves detailed planning to ensure optimal performance. The installation process unfolds in several steps, based on the specific conditions for the project, as the first important step for the installation is building a solid foundation.

We use only the latest technology and knowledge in the installation process. The elevation of the mast itself takes two separate steps. For the first step we employ an auxiliary arm to help us partially erect the mast. For the next phase mast climbers finish the assembly of the tallest parts of the mast to guarantee a precise and secure raising process. This innovative approach not only enhances efficiency but also complies with the highest safety standards.

Under favorable meteorological conditions, our team can complete the er****on of the mast within 2 days.

Address

Улица Дойран 160
Pleven
5800

Opening Hours

Monday 09:00 - 18:00
Tuesday 09:00 - 18:00
Wednesday 09:00 - 18:00
Thursday 09:00 - 18:00
Friday 09:00 - 18:00

Telephone

+359887432531

Alerts

Be the first to know and let us send you an email when Wind Mast Europe posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Wind Mast Europe:

Share