West Carpentry

West Carpentry Custom House Framer Serving Southern Ottawa!

12/29/2025

Clean hip roof, roof we did on a commercial site in Kingston this past October

Basement renovation by West Carpentry featuring a custom gas fireplace with natural stone, detailed trim around the stai...
12/27/2025

Basement renovation by West Carpentry featuring a custom gas fireplace with natural stone, detailed trim around the stairs, a barn door, and a full bathroom with shower. Finished in time for Christmas and already being enjoyed

Prescott 4-plex framed and ready for the next trades Built right from day one. 🔨
12/18/2025

Prescott 4-plex framed and ready for the next trades
Built right from day one. 🔨

10/07/2025

Just getting around to sharing some of last fall’s work. This one was a blast — we tore off two-thirds of the roof and r...
09/24/2025

Just getting around to sharing some of last fall’s work. This one was a blast — we tore off two-thirds of the roof and raised it up to turn an attic with barely any headroom into full living space. Added two bedrooms, a bathroom, and high ceilings with tons of natural light ✨.

The family stayed inside while we worked, so we had to tarp the house tight — not a single drop of water got in. Third time we’ve done a project like this, and it’s always so satisfying to pull it off.

Proud to be part of the build at Sam’s Grill in Brockville!We handled the interior and exterior partition walls, install...
09/19/2025

Proud to be part of the build at Sam’s Grill in Brockville!
We handled the interior and exterior partition walls, installed cement board behind the stoves and grills for fire rating, and finished the kitchen with FRP panels for a clean, durable surface. The rest of the space we completed with drywall.

Sam’s Grill is the newest burger spot in town, serving fresh burgers and hand-cut fries 🍔🍟. Highly recommend checking them out!

“Floors ✔️ Walls ✔️ Three singles up in Embrun this July 💪              ”
09/15/2025

“Floors ✔️ Walls ✔️ Three singles up in Embrun this July 💪 ”

This past winter into spring, our team took on a major project downtown on Rochester Street: building over 2,000 feet of...
09/13/2025

This past winter into spring, our team took on a major project downtown on Rochester Street: building over 2,000 feet of fully insulated exterior parapets, plus boxing around hatches, concrete pillars, post bases, and more across two buildings, including rooftop and balcony levels.

The parapets were designed with full insulation and an overhang to cover all exposed concrete and prevent thermal bridging into the building. Working on the edge of 10 story buildings required careful organization, coordination, and attention to safety.

Working through tough winter conditions, our crew relied on retractable harnesses and strict safety practices — and I’m proud to say the job was completed ahead of schedule.

This was months of hard work, across multiple levels and challenging conditions, and it couldn’t have been done without the effort of the entire team. Huge thanks to the guys and everyone involved in making this project a success! 👷‍♂️💪

📍 Ottawa, ON

3rd story addition we finished last week in the Glebe.
04/14/2025

3rd story addition we finished last week in the Glebe.

Address

Brockville, ON

Website

Alerts

Be the first to know and let us send you an email when West Carpentry posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to West Carpentry:

Share