09/09/2020
The construction is expected to be completed on 2021.
Project Description:
This building is used as a freezer, maintaining a temperature below 40 ÂșC.
Design of 22,000 square feet tilt-up building.
Structural engineer consulting
Exterior walls are sandwiched insulated tilt up panels with 6 inch insulation.
Insulation blocks are used below steel columns and bracing.