06/17/2026
Tocvan’s Pilot Mine at the Gran Pilar Gold-Silver Project is now actively taking shape in Sonora, Mexico as the company advances toward near-term production.
Latest drone footage shows trenching underway, roads already in place, and site prep progressing for a fully permitted 50,000-tonne heap leach facility, opening up near-surface oxide mineralization.
A 1.76-hectare heap leach pad is planned as part of this low-capex pilot, aimed at proving recoveries and setting the stage for scale.