08/28/2026
A practical look at Large Building Blower Door Testing in the field.
Following Part 1 of our Applied Learning Series, here’s a real project example from Paul Jifon showing how guarded blower door testing can be carried out in a building.
This project involved guarded blower door testing of two units within a multi-unit residential building in accordance with E779. Blower door fans were used in the test units and adjoining units to maintain similar pressure conditions, helping minimize air movement through shared walls, floors, and ceilings and isolate leakage through the exterior building envelope.
Our team completed both and testing and used a smoke puffer to help identify specific areas of air leakage within each unit. The collected airflow and pressure data were then analyzed to determine the applicable air leakage rate and documented in a final report for the client. - with Dawson Wallace Construction Ltd.
Our series continues with two upcoming sessions that take a closer look at the practical side of the testing process:
💻 Online and free to attend.
➡️Session Part 2 – Preparing the Building | September 2
Learn how to prepare a building for testing, including test boundaries, building conditions, equipment setup, temporary sealing and test-day readiness.
Register: https://www.eventbrite.ca/e/large-building-blower-door-testing-session-part-2-tickets-1998454220370
➡️Session Part 3 – Testing, Results & Solutions | September 9
Explore what happens on test day, how results are interpreted, and how testing can help identify air leakage and guide practical solutions.
Register: https://www.eventbrite.ca/e/large-building-blower-door-testing-session-part-3-tickets-1998454583456