09/28/2025
Akkerman guided boring systems paired with Michael Byrne Manufacturing boring equipment has been our go to for accurate installations for many years! Manufacturers support is second to none! Always appreciate the timely responses and parts dispatch. 👷🏼♂️
Under the busy lanes of HWY 63 near Fort McMurray, AB, Total Trenchless Ltd. tackled challenging raveling sand conditions with precision and innovation!
Using a multi-step approach with the Akkerman 240A GBM, they first established accurate line and grade, followed by guided pipe ramming with a TT Hammer, and finished with spoil removal using an MBM auger bore machine to install 345-LF. of 36-in steel casing. With the help of Akkerman’s lubrication system and precise guidance tools, the team-maintained face pressure and completed the bore with no disruption to surface traffic.
This project is a powerful example of innovation in action—combining pilot tube technology and pipe ramming to navigate tough ground and tight tolerances! Read the full case study to learn more about the project and equipment at: https://bit.ly/41NsN0o