Coral Rock Construction PEI Delivering affordable, high-quality homes across PEI — from skilled trades to full builds.

🌲 Pine tongue & groove install completedThis space was transformed using natural pine — clean lines, tight joints, and a...
03/27/2026

🌲 Pine tongue & groove install completed

This space was transformed using natural pine — clean lines, tight joints, and a warm finish that completely changes the feel of the room.

There’s something different about real wood.
It brings a sense of calm, comfort, and connection to nature that you don’t get with synthetic materials.



🔨 Clean install
🌿 Natural finish
🏡 Built to last



Thinking about upgrading your space with natural materials?
📩 DM us for a quote

🏠🔨 Roofing Phase BeginsBig milestone on this build — we’re officially starting the roofing stage today.After completing ...
03/12/2026

🏠🔨 Roofing Phase Begins

Big milestone on this build — we’re officially starting the roofing stage today.

After completing the structural framing, installing the roof sheathing, and finishing the waterproofing, we’re now moving into the final step to close the structure: installing the shingles. This will fully seal the house and bring the project to a proper watertight finish.

It’s always satisfying to see a structure go from framing to a fully protected home. One step closer to completion.

More progress updates coming soon.

🏨 Another project wrapped up this week.Our crew completed a carpet installation at the Delta Hotel, including flooring w...
03/10/2026

🏨 Another project wrapped up this week.

Our crew completed a carpet installation at the Delta Hotel, including flooring work and the stairs. Always satisfying seeing everything come together clean and properly fitted.

Even smaller projects require attention to detail to make sure everything lines up properly and looks right in the space.

Good work by the team getting it done.

🏗️ Framing Stage CompleteWe’ve officially wrapped up the framing phase, including roof sheathing and waterproofing, brin...
03/10/2026

🏗️ Framing Stage Complete

We’ve officially wrapped up the framing phase, including roof sheathing and waterproofing, bringing this build very close to a fully closed shell.

Next up we’ll be installing the roof shingles, which will complete the exterior protection of the structure before the project takes a short pause.

It’s always exciting to see a project reach this stage — when the structure truly starts to feel like a home.

Great work by the team getting us to this milestone. More updates soon. 👷‍♂️

Delta Hotel Carpet Replacement ProjectWe recently completed a carpet replacement at the Delta Hotel after the existing f...
02/21/2026

Delta Hotel Carpet Replacement Project

We recently completed a carpet replacement at the Delta Hotel after the existing flooring was affected by deep stains that could not be removed through cleaning.

Our team removed the damaged carpet, prepared the surface, and installed new carpet to restore a clean, professional look for guests and staff. The refreshed flooring improves both appearance and cleanliness while maintaining the high standards expected in hospitality spaces.

If your commercial property needs flooring replacement or restoration, we’re ready to help.

Framing Progress Update 🏗️Over the past month we’ve made strong progress on this build. Roof trusses are fully installed...
02/21/2026

Framing Progress Update 🏗️

Over the past month we’ve made strong progress on this build. Roof trusses are fully installed, wall and roof sheathing are complete, and exterior insulation is underway as we prepare to close in the structure.

Our final goal before pausing work is to complete the waterproofing and weatherproofing, ensuring the home is protected before the rainy season begins. Once funding resumes, we’ll continue pushing toward the next phase.

Proud of the progress so far and excited for what’s ahead.

01/19/2026

🌿 Spring Decks, Pergolas & Landscaping Projects 🌿

Spring is the perfect time to upgrade your outdoor space. We design and build custom decks, pergolas, and complete landscaping solutions to fit your home, style, and budget.

✔️ Custom decks & stair systems
✔️ Pergolas & outdoor structures
✔️ Landscaping, grading & yard improvements
✔️ Quality materials & skilled workmanship
✔️ Free quotes & great prices

Whether you’re refreshing your backyard or starting from scratch, we’ll help bring your vision to life—on time and built to last.

📞 Book your free quote today
🌐 Coral Rock Construction
Licensed & insured

Delivering affordable, high-quality homes across PEI — from skilled trades to full builds.

Second Floor Framing – Next Steps 🏗️We’re moving into the next phase of the build with the second floor framing underway...
01/19/2026

Second Floor Framing – Next Steps 🏗️

We’re moving into the next phase of the build with the second floor framing underway. The exterior is partially sheathed, and the current focus is completing the rough framing—setting walls, tying the structure together, and preparing for roof trusses.

This stage allows us to finalize alignment and structural details before the remaining sheathing is completed. Once rough framing is finished, we’ll proceed with:
• Completing exterior wall sheathing
• Installing the weather barrier
• Waterproofing the building envelope

This sequence ensures everything is properly aligned and ready to be sealed tight for the next stages of construction.

Second Floor Truss System Installed 🏗️The second floor truss system is now in place, providing a solid structural platfo...
01/19/2026

Second Floor Truss System Installed 🏗️

The second floor truss system is now in place, providing a solid structural platform while protecting the first floor from weather exposure. With the trusses set, the lower level is now covered, allowing interior work to continue while we move ahead safely and efficiently.

This step is a major milestone in the build, locking in floor structure, load paths, and overall stability as we prepare for the next phases.

More progress coming soon.

We build your home shell on your land with zero down for qualified homeowners and builders. Our watertight package is de...
01/19/2026

We build your home shell on your land with zero down for qualified homeowners and builders. Our watertight package is designed to remove financing roadblocks by delivering a code-compliant, inspected, dried-in structure ready for interior finishes.

What we do:
• Foundation construction
• Full structural framing
• Wall & roof sheathing
• Waterproofing system

Extras available:
• Plans & design options for your land
• Custom layouts and sizes
• Permit and inspection coordination

Starting at:
💰 From $49,000 (homes up to 1,500 sq ft)

📞 Contact us today to price your dream home and confirm eligibility.

Framing the First Floor — Get It Right From the Start 🏗️Framing the first floor isn’t just about standing walls—it’s abo...
01/09/2026

Framing the First Floor — Get It Right From the Start 🏗️

Framing the first floor isn’t just about standing walls—it’s about precision. This level becomes the foundation for the entire structure above, including the second-floor system.

✔️ Walls must be straight – any bow or twist now will multiply upstairs
✔️ Walls must be level and plumb – floors, ceilings, and finishes depend on it
✔️ Layout must be accurate – joists, trusses, and loads rely on this alignment

Every plate, stud, and line matters. If the first floor is true, the second floor goes up faster, cleaner, and stronger. If it’s off—even slightly—you’ll fight it all the way to the roof.

Build straight. Build level. Build once.
This is where good framing shows.

Address

24 Gilbert Drive
Charlottetown, PE
C1C0W2

Opening Hours

Monday 9am - 8pm
Tuesday 9am - 8pm
Wednesday 9am - 8pm
Thursday 9am - 8pm
Friday 9am - 8pm
Saturday 9am - 8pm
Sunday 9am - 8pm

Alerts

Be the first to know and let us send you an email when Coral Rock Construction PEI posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share