05/08/2026
Commercial-scale growing demands commercial-grade strength from the ground up.
This agricultural project features three large greenhouses totalling 162 screw piles. Phase one is officially complete, with two of the buildings locked securely onto 54 piles each (108 total). Phase two is already lined up for the fall, bringing another 54 piles for the final building.
When you're dealing with massive multi-structure setups, standard foundations just won't cut it. Engineered screw piles provide the precision, uniform depth, and heavy-duty load capacity needed to keep these large structures completely square, level, and shifting-free through every season.
Got a large-scale project on the horizon?
For estimates and inquiries, text: 780-901-4555