10/21/2026
A workforce accommodation camp was being set up in Dawson City, Yukon, and the permit required drawings stamped by an engineer registered in the Yukon. CVL was brought in to review the camp buildings and provide the engineering needed to get the permit through.
Our work included a structural review of a three-unit modular office complex on stacked wood block foundations, checked against NBC 2020 and Dawson City's climate data. We also reviewed the cribbing foundation and firewall drawings, and designed a lined containment berm for the wastewater tank. Once construction was complete, we did the field review and issued a letter of assurance for the ramps, decks and walkways.