10/21/2026
Di-Corp has the fluids and additives supply and experience necessary for tunneling and micro-tunneling project. Read our case study on how we helped Technicore Underground with challenging ground conditions on a pipeline project. In doing so, our tailored slurry design eliminated the need for costly jacking stations and reduced overall project time and costs.
https://www.di-corp.com/case-studies/micro-gel/