10/15/2026
When utility trenching on William Street ran directly into embedded rock, heavy blasting wasn't an option next to active utility mains and residential properties. See how non-explosive rock breaking kept this project moving safely and on schedule:
Check out the full case study:
👉
Trenching through Metro Vancouver’s established urban corridors often reveals unexpected subterranean challenges. On William Street, an active excavation for