07/29/2025
Living room renovation (Part 2)
I got the insulation in, and the v***r berrier up. It was time to drywall, mudd, and tape. Then, it was primed and painted. I made all new pine window jambs and window casements. The originals would not work with new window jamb depth.
Then, everything was stained to match the old trim color. Overall, everything came out nice with a ceiling height 12" higher than when I started.