Circuit Energy

Call Directions Website Contact the business

Circuit Energy We deliver turnkey solar, battery energy storage, power quality and UPS solutions for Ontario manufacturers.

From design and engineering to installation and commissioning, we handle every step to help you lower energy costs, and reduce peak demand charges

Five hours a year set a Class A factory's Global Adjustment bill. Miss them, and you pay for the next 12 months.A batter...
10/29/2026

Five hours a year set a Class A factory's Global Adjustment bill. Miss them, and you pay for the next 12 months.

A battery can cut that cost without cutting production, but only if it's engineered for your site, not just sold to it.

Our guide shows Ontario manufacturers how to choose the right battery storage provider. Link in comments.

A large industrial bill can contain very different sources of cost:- Energy consumption.- Demand.- Global Adjustment exp...
10/27/2026

A large industrial bill can contain very different sources of cost:
- Energy consumption.
- Demand.
- Global Adjustment exposure.
- Power factor charges.
And, in some cases, costs are associated with electrical conditions affecting equipment performance and reliability.
Reviewing 12 months of electricity bills, along with interval data, helps identify where costs come from and which energy projects make the most sense.

10/24/2026

Solar incentives have changed. Review your project economics.
Explore the incentives available to your business and reassess your solar project's potential savings, investment, and payback.
Contact Circuit Energy to evaluate your options.

10/19/2026

You need to understand the facility's load profile and electricity costs before deciding.
Solar generates energy during the day and can reduce the amount you purchase from the grid.
A battery does something different. It stores energy and gives you more control over when you use or discharge it. That can help manage peak demand and other electricity costs, depending on the facility's tariff and operating profile.
The key is to model both systems against the same load data and compare the value each one delivers.

For Ontario Class A facilities, Global Adjustment exposure is based on the facility's contribution to the province's fiv...
10/15/2026

For Ontario Class A facilities, Global Adjustment exposure is based on the facility's contribution to the province's five coincidental peaks during the base period.

That makes timing important.
A facility may have a high-demand event that matters operationally—but a different interval can matter more when evaluating the potential value of BESS for Global Adjustment management.
That's why battery sizing should start with interval data, not a monthly electricity bill.

Five peaks can change the economics of a battery project.

Grateful for the people who make what we do meaningful. 🤎Wishing our clients, partners, team, and their loved ones a ver...
10/12/2026

Grateful for the people who make what we do meaningful. 🤎
Wishing our clients, partners, team, and their loved ones a very happy Thanksgiving from all of us at Circuit Energy. 🍂

10/08/2026

Ontario’s solar incentive has changed here’s what it means for project economics. Fahad Rashid from Circuit Energy breaks down the new $770/kW Save on Energy incentive, why Global Adjustment matters for Class A facilities, and what industrial facilities should consider when evaluating solar. Want to see what solar could deliver at your facility? Send us 12 months of electricity bills.
📅 Book a consultation:
🌐 https://na3.hubs.ly/y0FJ_c0 (https://na3.hubs.ly/y0FJ_r0)

A real project. Measurable results. Industry recognition. ⚡We’re proud to see our power factor correction project with S...
10/02/2026

A real project. Measurable results. Industry recognition. ⚡
We’re proud to see our power factor correction project with Sofina Foods’ Brampton plant featured at the Save on Energy 2026 Energy Management Excellence Summit.
Working with Sofina Foods, Circuit Energy installed a 1,125 kVAR power conditioning system that delivered:
⚡ Improved power factor from 79% to 95%
⚡ 239 MWh/year in electricity savings
⚡ $55,000/year in avoided power factor penalties
At the summit, our Engineer, Mohmmad, joined Mr. Reza Zali, Energy Manager at Sofina Foods, beside the project showcase.
Sofina Foods was also named a finalist in the Industrial Excellence (Manufacturing) category for its work in energy efficiency across mechanical and HVAC applications.
Congratulations to the Sofina Foods team, and thank you for the continued trust and collaboration.

September 30 | National Day for Truth and ReconciliationToday is a time to reflect on the history and lasting impacts of...
09/30/2026

September 30 | National Day for Truth and Reconciliation
Today is a time to reflect on the history and lasting impacts of residential schools, and to recognize our responsibility to keep learning and listening.

09/28/2026

Why do capacitor banks keep failing?
Repeated capacitor failures can be a symptom of something happening elsewhere in the electrical system.

In this video, Jordan from Circuit Energy explains how harmonic resonance can contribute to repeated capacitor failures and why replacing the equipment without investigating the underlying conditions may not solve the problem.

Address

1902-5775 Yonge Street
North York, ON
M2M4J1

Alerts

Be the first to know and let us send you an email when Circuit Energy posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Circuit Energy:

Shortcuts

Share

Nearby engineering companies