09/01/2026
**The locate is only good for the area requested.**
A locate is completed based on the scope and work area provided to the locator.
If the excavation area changes or expands, don't assume the surrounding area was also cleared just because utilities were marked nearby.
Underground infrastructure doesn't conveniently stop at the edge of the original work area. Facilities outside that area may not have been part of the locate at all.
At Absolute Locating, we include a **30-metre buffer around all areas of work** as part of our locate area.
But if the scope of work changes, the locates need to be updated to reflect the new scope and work area.
**If the work area changes, update the locate. Make sure the entire new work area, including the required 30-metre buffer, is covered before excavation begins.**
A few extra metres can mean an entirely different underground picture.