10/22/2026
Floor framing complete in Niagara Falls!
Read the full post here π
https://theinnovativegroup.ca/project_updates/niagara-falls-home-addition-engineered-floor-framing-update/
Our 500-square-foot rear addition project just hit another big milestone. The entire engineered floor system is framed, glued, fastened, and ready for walls.
Because this in-law suite sits low to grade (~18" at the highest point) and needs a smooth, step-free entry into the existing house, ceiling heights and floor levels were critical. We engineered the floor deck using 11 7/8" deep, 3-ply LVL flush beams and matching 11 7/8" wood I-joists supplied by Taiga Building Products.
To top it off, we installed premium Weyerhaeuser 3/4" Edge Gold OSB subflooring. These panels feature built-in Down Pore drainage channels that route rainwater right off the deck during framingβpreventing edge swelling and keeping the subfloor perfectly flat no matter what autumn weather hits us.
With a rock-solid, squeak-free floor platform locked in, wall framing is officially underway!
Stay tuned for the next update as walls go up!
The Innovative Group Messing Carpentry & ContractingMessing Carpentry & Contracting
Highland Hammer Carpentry Co.