Global Rigging and Transport

Global Rigging and Transport Global Rigging & Transport is a world renowned Heavy-Lift and Heavy-Transport company.

09/01/2026

Ray-Mont Logistics opens $750 million hub at the Port of Prince Rupert in time to join Canada's push to double non-U. S. exports by 2035.

09/01/2026

Marine Insight - The maritime industry guide.

Port cranes are built for the long haul but keeping them productive takes the right maintenance, servicing and strategy....
08/27/2026

Port cranes are built for the long haul but keeping them productive takes the right maintenance, servicing and strategy.

GRT supports crane life-extension and refurbishment projects including:
• Structural and mechanical servicing
• Component removal and replacement
• Rigging and heavy-lift support
• Repairs, modifications and upgrades
• Planned rejuvenation work to keep existing assets in service

For terminals and operators, rejuvenating existing equipment can be a practical alternative to full replacement particularly when the core crane structure still has years of service ahead of it.

Using a barge crane gives marine and heavy-lift projects a practical advantage where access, reach and positioning are c...
08/25/2026

Using a barge crane gives marine and heavy-lift projects a practical advantage where access, reach and positioning are critical.

Benefits include:
• Lifting and placement directly from the water
• Reduced reliance on limited landside access
• Greater flexibility for port, marine and industrial work
• Efficient handling of large components and equipment

It’s a reliable solution for projects that demand safe, controlled lifting in challenging waterfront environments.

08/24/2026

Year-round shipping is possible on Hudson Bay without the use of the most expensive icebreakers, a spokesperson for Premier Wab Kinew says.

08/24/2026

Premier Wab Kinew says it will cost $70 to $80 billion to build a Port of Churchill expansion that includes an offshore liquefied natural gas terminal in Hudson Bay.

Dry docking an oil rig is a little more involved than simply getting it out of the water.It takes:• Heavy jacking and co...
08/20/2026

Dry docking an oil rig is a little more involved than simply getting it out of the water.

It takes:
• Heavy jacking and controlled load transfer
• Engineered shoring and support
• Careful positioning and load management

A good example of the planning, equipment and experience required for complex dry-docking operations.

GRT supports crane offloads, assembly, rail installation, and heavy-move planning for major port equipment.Coordinating ...
08/17/2026

GRT supports crane offloads, assembly, rail installation, and heavy-move planning for major port equipment.

Coordinating every stage from arrival through commissioning.

Not every heavy-lift or transport challenge has an off-the-shelf answer.For this custom fabrication project, our team to...
08/13/2026

Not every heavy-lift or transport challenge has an off-the-shelf answer.

For this custom fabrication project, our team took the work from raw steel and fit-up through fabrication and finishing to create a purpose-built frame for a specific application.

That in-house capability helps GRT develop practical solutions when standard equipment is not the right fit bringing fabrication, rigging knowledge and project requirements together from the outset.

08/11/2026

A view you don’t often get to see.

POV footage from beneath an 2000 tonne STS crane during a demolition project completed by Global Rigging & Transport.

Careful planning, precise ex*****on and an experienced team working together to bring the structure down safely and efficiently.

Address

#200/19399 96th Avenue
Surrey, BC
V4N4C4

Alerts

Be the first to know and let us send you an email when Global Rigging and Transport posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Global Rigging and Transport:

Shortcuts

Share