02/18/2026
The Enbridge, Toronto Office Project is Complete!
We’re proud to have delivered Enbridge’s new LEED Gold targeted operations and office facility in downtown Toronto, comprising underground parking, three storeys, and a penthouse level.
This project required careful planning and ex*****on from day one. The site was widely regarded as one of the most contaminated in Toronto, requiring significant remediation and environmental controls before vertical construction could begin. Rochon developed and implemented a comprehensive Soil and Groundwater Management Plan, ensuring all impacted soil and groundwater were handled in full compliance with applicable environmental regulations, including the off-site disposal of contaminated materials.
These remediation requirements drove a highly technical build, relying on deep excavations, shoring, dewatering, and suspended slab construction, all executed within the constraints of a dense urban environment.
Delivered with long-term flexibility in mind, the structure was engineered to accommodate future vertical expansion, with roof-level and structural provisions in place to support additional storeys as Enbridge’s needs evolve.
A complex site. A technically demanding build. A future-ready, high performance facility - all delivered with client satisfaction!
Thank you to our Partners: Enbridge, WalterFedy