MD Steele Construction

MD Steele Construction Committed to constructing top quality buildings and infrastructure in Manitoba since 1993.

We're Hiring: Junior Project Coordinator (Remote - 2 weeks on, 1 week off)Looking to join a team where your voice matter...
06/09/2026

We're Hiring: Junior Project Coordinator (Remote - 2 weeks on, 1 week off)

Looking to join a team where your voice matters and growth is part of the plan?

M. D. Steele Construction Ltd. is seeking a Project Coordinator to join our team. You will work closely with our Project Managers and Superintendents to keep projects running smoothly from documentation to site coordination.

What You'll Get:

Competitive salary and annual bonuses
RRSP contributions
Health, dental, vision and life insurance
Employee Assistance Program
Career development and training
A team-first culture that invests in your future
Safe work environment

To see the full job description and submit your resume, please follow the link below.

https://mdsteele.mb.ca/job_listing/project-coordinator/

06/08/2026

We are back at the Pembina Overpass with Josh.

Last week the deck got miled by 65 mills and this week the crew has Liqua-Jet on site hydro demoing the approaches.

L&A Scaffolding is set up for the overhang decks, guys are hand chipping the median and sidewalks, and rebar is on the way in so forming on the approaches can get started.

A lot of moving pieces on this one and the crew is on top of all of it. More updates to come.

NEWPCC Primary Clarifier Upgrades from above. A complex job in a tight space and the crew has navigated every bit of it....
06/05/2026

NEWPCC Primary Clarifier Upgrades from above. A complex job in a tight space and the crew has navigated every bit of it. The site is looking different every time we get the drone up and that progress does not happen by accident.

06/03/2026

Early mornings. Long days. Tough conditions. This work is not for everyone and the MD Steele crew would not have it any other way.

Built in 1890 and still carrying 200 trains a day. The Forth Bridge in Scotland is one of those structures that makes yo...
06/01/2026

Built in 1890 and still carrying 200 trains a day. The Forth Bridge in Scotland is one of those structures that makes you stop and appreciate what people were capable of building over 135 years ago.

54,000 tonnes of steel. 6.5 million rivets. 4,000 workers. At least 73 lives lost. Seven years of construction. And a bridge that has never stopped working since the day it opened. UNESCO made it a World Heritage Site in 2015 and honestly it is hard to argue with that.

This is the kind of work that reminds you why infrastructure matters and why the people who build it deserve to be recognized.

Yes these photos are from March. Yes there is still snow on the ground. No we are not sorry.The Silver Drain Box Culvert...
05/28/2026

Yes these photos are from March. Yes there is still snow on the ground. No we are not sorry.

The Silver Drain Box Culvert in Arborg is in the final stages and the concrete is poured. A long winter did not slow this crew down one bit. Almost a wrap on this one.

05/27/2026

St. Mary's Floodway Bridge from above. The girders are in and the crew has moved into forming the deck. Every time we get back up here the site looks different and that is a good thing. This project is really starting to take shape.

The crew at St. Mary's putting in the work. Deck formwork going up, overhang brackets being hung, and rebar tying on the...
05/26/2026

The crew at St. Mary's putting in the work. Deck formwork going up, overhang brackets being hung, and rebar tying on the horizon.

A lot of moving pieces on this one and these guys are on top of every single one of them.

05/22/2026

NEWPCC Primary Clarifier Upgrades from above. What started as an empty site has turned into something worth watching. This drone edit captures the different stages of this project and seeing it all pieced together like this makes you appreciate just how much work has gone into it.

The crew at NEWPCC doing what they do best. There is a lot going on at this site right now and these guys are in the mid...
05/21/2026

The crew at NEWPCC doing what they do best. There is a lot going on at this site right now and these guys are in the middle of all of it every single day. Good people doing good work.

Address

26–1051 Kapelus Drive
Winnipeg, MB
R4A5A4

Alerts

Be the first to know and let us send you an email when MD Steele Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MD Steele Construction:

Share