CP Pump Systems

CP Pump Systems Our high-tech centrifugal pumps handle difficult liquids - and your processes. Established in 1948, CP is an industrial company based in Zofingen, Switzerland.

Because we know your challenges and support you with highly reliable, hermetically sealed and efficient centrifugal pumps that we develop and produce in Switzerland Today, we operate in more than 40 countries and generate over 80% of our sales outside Switzerland.

DK HUB GLOBAL 2026 approche — et nous y serons. ⚙️Retrouvez CP Pump Systems au stand C12 les 20–21 mai 2026 au Kursaal d...
13/05/2026

DK HUB GLOBAL 2026 approche — et nous y serons. ⚙️

Retrouvez CP Pump Systems au stand C12 les 20–21 mai 2026 au Kursaal de Dunkerque.
Deux journées dédiées aux échanges industriels, aux solutions de pompage et aux nouvelles opportunités dans les secteurs process et énergie.

📍 Dunkerque, France
🤝 Stand C12
Passez nous voir à Dunkerque.



DK HUB GLOBAL 2026 is coming — and we’ll be there. ⚙️

Meet CP Pump Systems at booth C12 on May 20–21, 2026 at the Kursaal de Dunkerque.
Two days of industrial exchange, pump technology discussions and new opportunities across process and energy industries.

📍 Dunkirk, France
🤝 Booth C12
See you in Dunkirk.

Dichtungslose Magnetkupplungspumpen zur Förderung von saurem Prozesswasser in der Düngemittelproduktion: Für ein neues P...
07/05/2026

Dichtungslose Magnetkupplungspumpen zur Förderung von saurem Prozesswasser in der Düngemittelproduktion: Für ein neues Pondwasser-Rückführungssystem in Kanada lieferte CP Pump Systems drei MKP 200-150-500 Prozesspumpen.

Die hermetisch dichte Bauweise gewährleistet maximale Prozesssicherheit, hohe Korrosionsbeständigkeit und langfristige Betriebssicherheit unter anspruchsvollen Betriebsbedingungen.

Mehr zum Projekt:
https://www.cp-pumps.com/de/blog/mkp-200-150-500-kanada

Sealless magnetic drive pumps for acidic pond water service in fertilizer production: CP Pump Systems supplied three MKP 200-150-500 process pumps for a new pond water return system in Canada.

The hermetically sealed design ensures maximum process safety, corrosion resistance, and long-term operational reliability under demanding operating conditions.

Learn more:
https://www.cp-pumps.com/en/blog/mkp-200-150-500-canada

Sealless Magnetic Drive Pumps for Acidic Pond Water Service in Fertilizer Production

IFAT Munich 2026Mittendrin statt nur dabei: Wir sind aktuell auf der IFAT Munich und bereits in zahlreichen Fachgespräch...
05/05/2026

IFAT Munich 2026

Mittendrin statt nur dabei: Wir sind aktuell auf der IFAT Munich und bereits in zahlreichen Fachgesprächen mit Besuchern und Partnern.

Die Themen sind klar:
– Effizienz steigern
– Prozesse absichern
– individuelle Anforderungen gezielt umsetzen

Gemeinsam mit VDMA zeigen wir, wie sich genau das technisch realisieren lässt – praxisnah und lösungsorientiert.

📍 Halle B4, Stand 250/151 | noch bis 7. Mai
Wir freuen uns auf weitere Gespräche vor Ort.

Kostenlose Tickets🎟️ https://lnkd.in/eyESwDHe

IFAT Munich 2026 Auf der IFAT Munich 2026 zeigt CP Pump Systems gemeinsam mit VDMA, wie moderne Pumpentechnologie komple...
29/04/2026

IFAT Munich 2026

Auf der IFAT Munich 2026 zeigt CP Pump Systems gemeinsam mit VDMA, wie moderne Pumpentechnologie komplexe Anforderungen zuverlässig löst.

📍 4.–7. Mai 2026 | Halle B4, Stand 250/151

Freuen Sie sich auf konkrete Einblicke, praxisorientierte Lösungen und einen offenen fachlichen Austausch.
Wir nehmen uns Zeit für Ihre Fragen und individuellen Anforderungen.

🎟️ Kostenlose Tickets:
https://www.vdma.eu/de/viewer/-/v2article/render/159768534

Heute dreht sich in Leuna alles um Industrie und Innovation – wir sind vor Ort.Im cCe Kulturhaus präsentieren wir unsere...
23/04/2026

Heute dreht sich in Leuna alles um Industrie und Innovation – wir sind vor Ort.

Im cCe Kulturhaus präsentieren wir unsere Pumpensysteme für komplexe Anwendungen.

Die ersten wertvollen Gespräche haben bereits stattgefunden. Wir freuen uns auf alles, was noch kommt.

Mehr Infos: www.cce-leuna.de

Grüsse aus Leuna

🌍 Earth Day ist ein Reminder: Prozesse müssen nicht nur funktionieren, sondern verantwortungsvoll sein.CP Pump Systems k...
22/04/2026

🌍 Earth Day ist ein Reminder: Prozesse müssen nicht nur funktionieren, sondern verantwortungsvoll sein.

CP Pump Systems kombiniert Schweizer Präzision mit nachhaltigem Engineering – für langlebige Systeme und reduzierte Umweltbelastung über den gesamten Lifecycle.

cleaner pumps, cleaner planet

⚙️♻️

🌍 Earth Day is a reminder: processes must be responsible, not just functional.

CP Pump Systems combines Swiss precision with sustainable engineering – ensuring long service life and reduced environmental impact across the lifecycle.

cleaner pumps , cleaner planet

⚡ Immediately Available Pump SystemsPre-configured – for urgent response. CP Pump Systems provides pre-configured, fully...
21/04/2026

⚡ Immediately Available Pump Systems
Pre-configured – for urgent response. CP Pump Systems provides pre-configured, fully assembled pump units from stock – engineered for situations where time and operational reliability are critical.

🔧 Key facts:
16 defined pump units available from stock
Lead time: 1–2 weeks ex works
Supplied complete with base frame and motor
Customer specific impeller optimization done for each unit
Permanently available program, not a one-off campaign

📌 When our solution is applied:
Replacement of a failed pump
Reduction of downtime
Avoidance of project delays
Short-term expansion of existing installations

👉 More info: https://www.cp-pumps.com/en/blog/immediately-available-pump-systems

📩 [email protected]
| 📞 +41 62 746 85 85



⚡ Sofort verfügbare Pumpensysteme
Vorkonfiguriert – für schnelle Einsatzbereitschaft. CP Pump Systems liefert vorkonfigurierte, komplett montierte Pumpeneinheiten ab Lager – entwickelt für Situationen, in denen Zeit und Betriebssicherheit entscheidend sind.

🔧 Das Wichtigste:
16 definierte Pumpeneinheiten ab Lager
Lieferzeit: 1–2 Wochen ab Werk
Komplett geliefert mit Grundrahmen und Motor
Kundenspezifische Laufradanpassung je Einheit
Dauerhaft verfügbares Programm

📌 Einsatz:
Ersatz bei Pumpenausfall
Reduzierung von Stillständen
Vermeidung von Projektverzögerungen
Kurzfristige Erweiterung bestehender Anlagen

👉 Mehr Infos: https://www.cp-pumps.com/de/blog/sofort-verfuegbare-pumpensysteme

📩 [email protected]
| 📞 +41 62 746 85 85

Am 23. April 2026 öffnet der Leuna-Dialog seine Türen. CP Pumpen ist vor Ort.Im cCe Kulturhaus Leuna präsentieren wir du...
08/04/2026

Am 23. April 2026 öffnet der Leuna-Dialog seine Türen. CP Pumpen ist vor Ort.

Im cCe Kulturhaus Leuna präsentieren wir durchdachte Pumpenlösungen für komplexe industrielle Anforderungen.

Nutzen Sie die Plattform für fachlichen Austausch und neue Impulse.

Mehr Infos unter: www.cce-leuna.de

Wir freuen uns auf interessante Gespräche.

Happy Easter from CP Pump Systems 🐣To our employees, partners and customers, thank you for your trust and support. Wishi...
03/04/2026

Happy Easter from CP Pump Systems 🐣

To our employees, partners and customers, thank you for your trust and support. Wishing you joyful holidays, fresh energy and a beautiful start into spring.



Frohe Ostern von CP Pump Systems 🐣

An unsere Mitarbeitenden, Partner und Kunden, vielen Dank für Ihr Vertrauen und Ihre Unterstützung. Wir wünschen schöne Feiertage, neue Energie und einen wunderbaren Start in den Frühling.

Korea Chem is off to a great start together with our partner Dongil ENT.We already had some interesting customer visits ...
01/04/2026

Korea Chem is off to a great start together with our partner Dongil ENT.
We already had some interesting customer visits and valuable discussions around CP design at Booth 4A203.
Looking forward to the next days and further exchanges – feel free to stop by and connect.

📍 Korea Kintex 1 Exhibition Hall
📅 31.03.2026 – 03.04.2026

Behind every stable process is equipment you can rely on.CP Pump Systems develops chemical pumps built for continuous op...
24/03/2026

Behind every stable process is equipment you can rely on.

CP Pump Systems develops chemical pumps built for continuous operation in demanding applications across chemicals, hydrogen, and pharma.

Join us at ChemE Show 2026 and let’s talk about your process.

Use code SAVE10 for 10% off your ticket.
https://cheme-show.com/registration/
June 9–10, 2026 · Houston

Adresse

Im Bruehl
Zofingen
4800

Öffnungszeiten

Montag 08:00 - 17:00
Dienstag 08:00 - 17:00
Mittwoch 08:00 - 17:00
Donnerstag 08:00 - 17:00
Freitag 08:00 - 17:00

Telefon

+41627468585

Benachrichtigungen

Lassen Sie sich von uns eine E-Mail senden und seien Sie der erste der Neuigkeiten und Aktionen von CP Pump Systems erfährt. Ihre E-Mail-Adresse wird nicht für andere Zwecke verwendet und Sie können sich jederzeit abmelden.

Service Kontaktieren

Nachricht an CP Pump Systems senden:

Teilen