01/05/2025
We’re proud to announce that Sinoway ’s distributed photovoltaic (PV) project in Shandong has officially been connected to the grid on April 30th, 2025! This milestone marks a significant step toward our dual-carbon innovation goal by fully utilizing rooftop and ground spaces for clean solar energy generation.
The project adopts a multi-layered layout, covering over 65,440 m², including 20,029 m² of rooftop and 45,411 m² of ground-mounted arrays. With a system capacity of 5.27 MWp using high-efficiency N-type TOPCon modules, the system is expected to generate 567,000 kWh annually, with 90% self-consumed, significantly reducing electricity costs and carbon footprint.
By integrating a 10kV grid-tie station, Sinoway Carbon not only reduces energy expenses but also creates surplus power revenue—setting an example for industrial-scale solar transformation.
Keywords:
Sinoway Carbon, distributed solar, photovoltaic system, TOPCon module, low-carbon manufacturing, solar grid connection, green energy, sustainability in industry, carbon neutrality