LIFTING PLAN – TRANSFORMER HANDLING OPERATION
A detailed lifting plan has been prepared for the safe handling and unloading of a 10-ton transformer using a 100-ton XCMG QY100K mobile crane.
The lifting operation will be performed at a working radius of 14.0 meters with the crane configured on fully extended outriggers over level and stable ground conditions. According to the crane load chart, the available lifting capacity at the specified radius is 17.7 tons, which provides an adequate safety margin for the planned load.
The transformer will be lifted using a certified 4-leg chain sling bridle arrangement. All rigging accessories, including the master link, chain slings, shackles, and swivel hook, have been selected in accordance with the required Safe Working Load (SWL) and inspected prior to the operation.
:
• Crane Model: XCMG QY100K
• Crane Capacity: 100 Ton
• Boom Length: 26.0 m
• Operating Radius: 14.0 m
• Crane Capacity at Radius: 17.7 Ton
• Load Weight: 10 Ton Transformer
• Lifting Arrangement: 4-Leg Chain Sling Bridle Hitch
• Utilization of Crane Capacity: 56.49%
📌 Safety Controls Implemented:
✔ Fully extended outriggers deployed
✔ Ground stability verified before setup
✔ Certified lifting gears utilized
✔ Load balancing confirmed before hoisting
✔ Controlled lifting to avoid shock loading
✔ Dedicated banksman and lifting team assigned
✔ Operation conducted under approved lifting plan and risk assessment
The lifting activity shall be executed in compliance with site safety requirements, lifting procedures, and international safe lifting practices to ensure a controlled and incident-free operation.