Company Hutní montáže, a.s. - Rheinbrücke Duisburg-Neuenkamp (new bridge on the A40 motorway over the Rhine)
✅ The new bridge on the A40 motorway in Duisburg, Germany, represents one of the most significant bridge construction projects currently underway in the Rhine region. The entire eight-lane motorway crossing is designed as two separate bridge structures, with each traffic direction carried on its own deck. Both structures are supported by a system of 80 stay cable bundles anchored to four dominant pylons.
✅ The total length of the bridge is 802 metres, while the main span between the pylons reaches 380 metres. The bridge deck is situated approximately 42 metres above the River Rhine, and the pylons rise more than 71 metres above the deck level.
✅ The project is exceptionally demanding from a technical perspective and combines several advanced er****on technologies. The approach sections are being constructed using incremental launching methods, while the sections above the river are assembled using balanced cantilever er****on coordinated with the installation and tensioning of the stay cables. The project also involves extensive high-altitude works during the assembly of the steel pylon segments.
✅ Hutní montáže, a.s. is also participating in the project, carrying out the assembly of selected parts of the steel bridge structure. The scope of work includes the precise positioning and connection of individual bridge segments, assembly of pylon sections, and coordination of complex er****on activities at significant heights above the River Rhine.
✅ Bridge type: cable-stayed motorway bridge
✅ Purpose: eight-lane A40 motorway
✅ Total bridge length: 802 m
✅ Total width: 68.25 m
✅ Pylon height: approx. 75 m
✅ Main span between pylons: 380 m
✅ Number of separate bridge structures: 2 (one for each direction)
✅ Number of cable stays: 80 for each bridge deck
✅ Number of pylons: 4
✅ Deck height above the Rhine water level: approx. 42 m
✅ Included facilities: pedestrian and cycle paths
✅ Construction method: incremental launching + cantilever construction
✅ Replaces the original bridge from 1970
⚒
🏭