26/08/2026
Things are reaching great heights at a construction site in Izmir, Turkey. 🇹🇷
A new high-rise is taking shape there and right in the middle of it all, our technology ensures the reliable processing of the required support fluid for the foundation.
The following systems are being deployed:
- One BE 500 desanding plant with adjustable GS-500-V coarse screen
- Two BDS-125-20 desilters, each mounted on a BE-250-60
A powerful combination for efficient solids separation and smooth construction operations. When working at great heights, the technology must also operate reliably. That's why our technology is engineered to perform when it matters most. 💪
***
Hoch hinaus geht es aktuell auf einer Baustelle in Izmir, Türkei. 🇹🇷
Hier entsteht ein neues Hochhaus und mittendrin sorgt unsere Technik für eine zuverlässige Aufbereitung der benötigten Stützflüssigkeit.
Zum Einsatz kommen:
- Eine Entsandungsanlage BE 500 mit verstellbarem Grobsieb GS-500-V
- Zwei Desilter BDS-125-20, jeweils auf einer BE-250-60
Eine leistungsstarke Kombi für effiziente Feststoffabscheidung und einen reibungslosen Bauablauf. Wenn es hoch hinausgeht, muss auch die Technik zuverlässig arbeiten. 💪