21/04/2026
🚨 Stuck access. Rising NPT. Escalating cost exposure.
When conventional wellbore access methods reach their limits, operational time, NPT and cost exposure can escalate quickly.
Join our live webinar to see how erosion-based obstruction removal can help restore well access while maintaining wellbore integrity — and why this matters for intervention, P&A and late-life well operations.
In this session, we will cover:
• how wellANT works
• where erosion-based removal adds value
• deployment options: Topside Drive today, coiled tubing next
• our current TRL 8 SIT progress
• typical application scenarios, including stuck plugs, restrictions and section eroding
Key benefits:
• Reduced operational time, NPT and overall cost exposure
• Restoring well access when conventional approaches reach their limits
• No need for high weight on bit in shallow applications
• Ability to pass spinning plugs and small restrictions
• Low reaction forces during operation
• Maintaining wellbore integrity throughout the process
🎓 Webinar | Two live sessions
From Stuck to Access: Erosion-Based Wellbore Obstruction Removal & Section Eroding
• 20 May | 10:00 CET / 09:00 UK https://eu1.hubs.ly/H0tHzWD0
• 21 May | 19:00 CET / 18:00 UK https://eu1.hubs.ly/H0tHym40
👉 Registration links are in the comments.
📩 Or request the right session directly via [[email protected]](mailto:[email protected])
tr bndcring