⚡ When every connection matters, the solution needs to be engineered for the job.
For the construction of a hydroelectric power plant in France, our Krah community member, System Group, supplied a specially engineered wall pe*******on piece connecting the concrete supply pipe to the turbine.
The system consists of 3 × 6-meter DN/ID 1400 mm Krah pipe segments, forming an 18-meter-long assembly, pre-jointed by electrofusion for a continuous, watertight pipeline.
At the interface with the concrete structure, a mechanical fl**ge end provides the required transition and connection.
A great example of how Krah technology goes beyond conventional pipelines—delivering custom-engineered solutions for demanding infrastructure applications.