08/12/2025
⚙️Replacement of a 4.0 MW, 10.5 kV Steam Turbine Generator.
In 2024, a complete replacement of the steam turbine generator was successfully carried out, installing a new 4295 kVA unit with fully matching electrical and mechanical specifications.
Scope of work included:
✅ engineering planning
✅ supply of a new identical generator
✅ dismantling of the existing unit
✅ installation, alignment and mechanical assembly
✅ electrical testing, commissioning and performance checks
✅ coordination with the grid operator and ex*****on of grid tests
📝 Our role as the Owner’s Engineer:
technical planning, supervision, contractor coordination, verification of design and operational solutions, quality control throughout all stages and full support up to the successful commissioning of the generator.
The project was delivered in partnership with Baltic Power Engineering OÜ