Smart engineering makes installation simpler⚙️ Bio Mobitek modular boiler houses are equipped with hydraulic support legs, allowing the modules to be unloaded directly from the trailer without a crane.
📐 Less space required on site
💶 Lower unloading and installation costs
🤝 Fewer contractors to coordinate
⏱️ Faster installation
🔌 Start-up in as little as two days
We have delivered boiler houses up to 6MW using this installation concept.
No crane. Less space. Faster installation. 🚛