08/04/2026
Successful Slipform Construction of Triangular Minarets in Benghazi ๐ฑ๐พ๐๏ธ
We are proud to announce the successful completion of the Slipform operations for the El-Raheem Mosque minarets at the Libya Mall Landmark project.
Executing a 35m height with a triangular cross-section required rigorous hydraulic control and continuous monitoring to ensure structural accuracy and vertical alignment. โ๏ธ
Scope: Design, provide and operation of Slipform system.
Geometry: 30cm thick walls in a precise triangular shape. ๐
Duration: 12 days of non-stop continuous pouring per minaret. โฑ๏ธ
Client: Elsaeed for Contracting and Real Estate.
A shoutout to the on-site team for their dedication during the 24/7 pouring cycle ๐ทโโ๏ธ๐
๐ฑ๐พ ๐๏ธ