Port Denia

Port Denia We combine a top-notch shipyard and marina, offering comprehensive services for yachts and superyachts.

Located in Spain, we are just 45 miles from Ibiza and Formentera, enjoying over 300 sunny days per year and a well-protected harbor.

We’re keeping up with maintenance and improvements around our facilities.  This includes preparing and repainting surfac...
27/08/2026

We’re keeping up with maintenance and improvements around our facilities. This includes preparing and repainting surfaces in the workshop, as well as dredging the travelift pit to increase the available draft.
Getting everything ready for the peak refit season ahead.

From design to reality: the project started taking shape as the support structures were fabricated and delivered to our ...
22/08/2026

From design to reality: the project started taking shape as the support structures were fabricated and delivered to our shipyard, ready for the next stage.
Once they were here, you could really appreciate their size and scale!

Structures designed by Maiara Marine Solutions | Ingeniería Naval | Escaneo 3D and fabricated by Cemelaser

Remember to keep an eye on the sky this Wednesday, 12 August! In Dénia, the eclipse will begin at 19:39:28, reaching app...
11/08/2026

Remember to keep an eye on the sky this Wednesday, 12 August!

In Dénia, the eclipse will begin at 19:39:28, reaching approximately 99% coverage at its maximum at 20:33:50. At that moment, the Sun will be only around 4° above the horizon, so make sure you find a high spot with a clear view towards the west.

In Ibiza, the eclipse will begin at 19:39:17, reaching totality at its maximum at 20:33:18.

In Palma, the eclipse will begin at 19:38:05, reaching totality at its maximum at 20:31:54.

Wherever you watch it from, remember to always use certified eclipse glasses when looking at the Sun and never look directly at it without proper eye protection.

We hope you enjoy this very special Mediterranean sunset!

Why do we need divers during a superyacht haul out?Before lifting begins, the slings need to be positioned exactly where...
07/08/2026

Why do we need divers during a superyacht haul out?

Before lifting begins, the slings need to be positioned exactly where they should be. Our Project Management team works from the yacht’s lifting plan to determine the correct position for each sling, but the final check happens underwater.

Once the Travelift is in position, the divers check each sling against the hull and stay in constant communication with the team ashore. They can make small adjustments underwater, or coordinate with the Travelift operator when further repositioning is needed.

The lifting plan is always the starting point, but what we find underwater doesn’t always match it exactly. That’s why the divers check the actual position of every sling and work with the team ashore until everything is correctly positioned before the lift begins.

It’s a part of the haul out that you don’t usually see, but an important one.

Dirección

Moll De La Pansa
Denia
03700

Notificaciones

Sé el primero en enterarse y déjanos enviarle un correo electrónico cuando Port Denia publique noticias y promociones. Su dirección de correo electrónico no se utilizará para ningún otro fin, y puede darse de baja en cualquier momento.

Contacto La Empresa

Enviar un mensaje a Port Denia:

Compartir