22/05/2024
HOLIDAY TOWNHOUSE RECONSTRUCTION | DEL DUQUE TENERIFE
🔻We are excited to present this project that had a transformation of a whole first floor, offering a space that combines functionality, style, and comfort. From the bedrooms to the bathrooms and common spaces, every detail has been designed to create a harmonious and welcoming environment.
🔻Our aim was to create an open-plan lounge and kitchen area and connect it to an external terrace. To achieve this, we extended part of the external wall and installed new sliding glass patio doors.
🔻We have installed a modern kitchen with large cabinets
🔻The most challenging work was a swimming pool, which had to be dug by hand, which slightly delayed finishing all renovation.
🔻In the bedrooms, we have maximized storage space with bespoke fitted wardrobes that offer both functionality and elegance.
Scope of Work
✔️ Exterior reconstruction
✔️ Swimming pool construction
✔️ Tilling and decorating of exterior patios and terraces
✔️ Basement conversion for added accommodation
✔️ 3 bathrooms with new tiling and sanitary ware
✔️ Tailor Made Kitchen designed and installed
✔️ 3 Bespoke fitted wardrobes
✔️ New sliding patio doors & windows installation
✔️ New electrics throughout with LED lighting
Tel: +34 603 14 44 56
🌐 www.tenerifefurniture.com