15/01/2026
After the festive break we are faced with the January struggles π« donβt we love it!
460m2 area for concrete along with tying into a new drainage system that we installed in the back end of last year. π€©
Future spring plans on this project weβll be installing a slurry separation system allowing our client to produce liquid gold π₯
Tying the existing slurry tank into a bigger tank with where all the equipment will be for separating
Keep an eye on for future progress ππ»
Give me a ring Lee on 07511272682 for any enquiries
Thank you Lee
β
Drainage
β
Landscaping
β
Patios
β
Steel erecting
β
Demolition
β
Building
β
Concrete
β
Fencing
β
Agricultural construction
β
Removals & Clearance
β
Pressure washing & External cleaning
β
Concrete shuttering