15/01/2026
After the festive break we are faced with the January struggles ๐ซ donโt we love it!
460m2 area for concrete along with tying into a new drainage system that we installed in the back end of last year. ๐คฉ
Future spring plans on this project weโll be installing a slurry separation system allowing our client to produce liquid gold ๐ฅ
Tying the existing slurry tank into a bigger tank with where all the equipment will be for separating
Keep an eye on for future progress ๐๐ป
Give me a ring Lee on 07511272682 for any enquiries
Thank you Lee
โ
Drainage
โ
Landscaping
โ
Patios
โ
Steel erecting
โ
Demolition
โ
Building
โ
Concrete
โ
Fencing
โ
Agricultural construction
โ
Removals & Clearance
โ
Pressure washing & External cleaning
โ
Concrete shuttering