19/06/2026
Great work by our colleagues at PCM AIRPOWER on delivering another energy-efficient compressed air solution for a customer in Belfast.
A fantastic example of how data-driven system upgrades can reduce energy consumption, lower operating costs and support sustainability goals. πβ‘
β‘ NEW INSTALLATION COMPLETED | BIOPAX LTD β‘
PCM AIRPOWER recently completed a new compressed air installation for the team at BioPax in Belfast.
Following a detailed data logging exercise on the site's existing compressor, our team identified significant energy losses caused by unloaded running hours.
To improve efficiency, PCM AIRPOWER recommended and installed a new BOGE Variable Speed Drive (VSD) compressor, allowing the system to better match compressed air demand and minimise wasted energy.
The result?
π· Estimated annual savings of Β£11,419
β‘ Estimated annual energy savings of 38,064 kWh
π Efficient operation between a 55% and 75% load profile
As a company committed to sustainable manufacturing, BioPax is also exploring additional energy-saving initiatives, including the potential use of compressor heat recovery technology.
A great project to be involved with and another example of how data-driven compressed air upgrades can deliver measurable results.