06/08/2026
Garage conversion is coming along nicley π
β
οΈ Ceiling lowerd and insulated.
β
οΈ Vapour control layer installed behind stud wall.
β
οΈ Stud walls insulated in-between studs and over to stop cold bridging
β
οΈ 1st coat of liquid dpm put down.
Level the floor, plaster and 2nd fix next week πͺπͺπͺ
π 07791296615
π www.devlin-homeimprovements.co.uk
π© [email protected]