06/06/2026
Here’s a short update of the jobs we are currently doing on Bagnall ‘Austerity’ No.2766.
The railway is running a fundraising appeal to help with the rising cost of materials needed to finish the overhaul.
The work has progressed brilliantly, but costs have risen — raw materials, copper for the boiler stays, specialist steels — all affected by global pressures impacting us all. We know times are tight but every contribution, however big or small, makes a real difference.
For example £8.50 covers a rivet, £33 covers a boiler tube - and of course, many parts are made in our workshop as they're no longer available to buy.
A heartfelt thanks from everyone in the workshop goes out to those who have been able to donate already.
To make a donation: https://bit.ly/4ucXqYx