04/04/2025
More curves going in!
The last section of curves are being set out, which leads into steps off the main garden area. Bricks pre drilled for cables, lighting will be set around this area at a low level.
The curve on the far side will be attached to a 6 metre long raised brick planter, that will finish up along the fence line.
This job has mostly consisted of setting out for the next sections to come, before getting stuck in! Still a long way to go with this one, the final finish is going to be worth the wait!
More updates of this job will come in 2 weeks time. As for now, a week off for Easter half term, followed by a few smaller jobs in between!