JW Engineering, Camborne

JW Engineering, Camborne Maker of bespoke railings, gates, etc.

Removal of modern decorative gates situated at the entrance to Polstrong Manor House, Camborne.  The gates were damaged ...
03/02/2026

Removal of modern decorative gates situated at the entrance to Polstrong Manor House, Camborne.

The gates were damaged beyond repair after being struck by, what was thought to be, a large agricultural vehicle. The gates and associated decorative ironwork were relatively recent additions to the property (approximately 25 years old) and the scrap steel weighed ¾ ton.

The completed restoration of the Oatey and Martyn Cornish Range.
03/02/2026

The completed restoration of the Oatey and Martyn Cornish Range.

The cylinder oiler of the 1840 beam engine at Levant Mine required repair. The oiler is mounted on the cylinder head of ...
08/12/2025

The cylinder oiler of the 1840 beam engine at Levant Mine required repair. The oiler is mounted on the cylinder head of the engine and dates back to when the engine was built.

The problem was the thread in the cast iron ball had stripped. We could not alter the thread on the wrought iron rod because it dates from 1840 and is a pre Whitworth thread.

The large thread is 9/16 by 11 TPI and the small thread is 15/32
by 12 TPI. We drilled and tapped the end of the wrought iron rod M8 diameter, Tig welded a short length of studding into the hole and then drilled and tapped the cast iron ball, therefore preserving the original thread.

The Pikrose tram winch at St Michael's Mount required repairs to the brake arms.
08/12/2025

The Pikrose tram winch at St Michael's Mount required repairs to the brake arms.

The barring motor, mounted on the 1840 beam engine at levant mine, is used to turn the steam engine when it stops on dea...
08/12/2025

The barring motor, mounted on the 1840 beam engine at levant mine, is used to turn the steam engine when it stops on dead centre.

The tyre had suffered a leak and required repair.

The restoration of the Oatey and Martyn Cornish Range is almost completed, we now only need to construct a metal flue.  ...
08/12/2025

The restoration of the Oatey and Martyn Cornish Range is almost completed, we now only need to construct a metal flue.

Repair of a tramline roller at St Michael's Mount.
08/12/2025

Repair of a tramline roller at St Michael's Mount.

Address

Meryasek House, Polstrong
Camborne
TR140QA

Alerts

Be the first to know and let us send you an email when JW Engineering, Camborne posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to JW Engineering, Camborne:

Shortcuts

Share